IEC Standardin muutokset. Yleistä

Samankaltaiset tiedostot
7.4 Variability management

Efficiency change over time

Organisaation kokonaissuorituskyvyn arviointi

SSTY:n EMC-seminaari. EMC ja sähköisten lääkintälaitteiden standardit. Ari Honkala SESKO ry

NESTE ENGINEERING SOLUTIONS

Olet vastuussa osaamisestasi

Toiminnallinen turvallisuus

LX 70. Ominaisuuksien mittaustulokset 1-kerroksinen 2-kerroksinen. Fyysiset ominaisuudet, nimellisarvot. Kalvon ominaisuudet

TIEKE Verkottaja Service Tools for electronic data interchange utilizers. Heikki Laaksamo

Toimitusketjun vastuullisuus ja riskien hallinta

Capacity Utilization

Curriculum. Gym card

Security server v6 installation requirements

LUONNOS RT EN AGREEMENT ON BUILDING WORKS 1 THE PARTIES. May (10)

C++11 seminaari, kevät Johannes Koskinen

SOTILASILMAILUTIEDOTE SIM-TO-LT-001 HENKILÖSTÖVAATIMUSTEN SOVELTAMINEN,

Tutkimuslääkkeiden GMP. Fimea Pirjo Hänninen

Security server v6 installation requirements

Innovative and responsible public procurement Urban Agenda kumppanuusryhmä. public-procurement

Results on the new polydrug use questions in the Finnish TDI data

You can check above like this: Start->Control Panel->Programs->find if Microsoft Lync or Microsoft Lync Attendeed is listed

Ohjelmien kehittämisstudiot varmistavat laadukkaat ja linjakkaat maisteriohjelmat Maire Syrjäkari ja Riikka Rissanen

Automaatiojärjestelmän hankinnassa huomioitavat tietoturva-asiat

FinFamily PostgreSQL installation ( ) FinFamily PostgreSQL

2017/S Contract notice. Supplies

Network to Get Work. Tehtäviä opiskelijoille Assignments for students.

SESKO ry LAUSUNTOPYYNTÖ 7/08 LIITE Toimisto (5) HUOM. Komiteoiden ja seurantaryhmien kokoonpanot on esitetty SESKOn komitealuettelossa

Tutkimusdata ja julkaiseminen Suomen Akatemian ja EU:n H2020 projekteissa

Infrastruktuurin asemoituminen kansalliseen ja kansainväliseen kenttään Outi Ala-Honkola Tiedeasiantuntija

Kaivostoiminnan eri vaiheiden kumulatiivisten vaikutusten huomioimisen kehittäminen suomalaisessa luonnonsuojelulainsäädännössä

HITSAUKSEN TUOTTAVUUSRATKAISUT

Lausuntopyyntöluettelo HUOM. Komiteoiden ja seurantaryhmien kokoonpanot on esitetty SESKOn komitealuettelossa

The CCR Model and Production Correspondence

16. Allocation Models

Jussi Klemola 3D- KEITTIÖSUUNNITTELUOHJELMAN KÄYTTÖÖNOTTO

Constructive Alignment in Specialisation Studies in Industrial Pharmacy in Finland

KONEISTUSKOKOONPANON TEKEMINEN NX10-YMPÄRISTÖSSÄ

Hankkeiden vaikuttavuus: Työkaluja hankesuunnittelun tueksi

ISEB/ISTQB FOUNDATION CERTIFICATE IN SOFTWARE TESTING III

TietoEnator Pilot. Ari Hirvonen. TietoEnator Oyj. Senior Consultant, Ph. D. (Economics) presentation TietoEnator 2003 Page 1

Enterprise Architecture TJTSE Yrityksen kokonaisarkkitehtuuri

On instrument costs in decentralized macroeconomic decision making (Helsingin Kauppakorkeakoulun julkaisuja ; D-31)

Rotarypiiri 1420 Piiriapurahoista myönnettävät stipendit

Standardi IEC Ohjelmisto

Käytön avoimuus ja datanhallintasuunnitelma. Open access and data policy. Teppo Häyrynen Tiedeasiantuntija / Science Adviser

Ajettavat luokat: SM: S1 (25 aika-ajon nopeinta)

KOMPETENSSIT. Koulutus Opiskelija Tuuttori. Business Information Technologies. NQF, Taso 6 - edellyttävä osaaminen

VUOSI 2015 / YEAR 2015

Hankkeen toiminnot työsuunnitelman laatiminen

Sisällysluettelo Table of contents

Arkkitehtuuritietoisku. eli mitä aina olet halunnut tietää arkkitehtuureista, muttet ole uskaltanut kysyä

MUSEOT KULTTUURIPALVELUINA

anna minun kertoa let me tell you

Choose Finland-Helsinki Valitse Finland-Helsinki

Uusi SFS-ISO/IEC 27001:2013. Jyrki Lahnalahti Versio 1.0

TESTAUSPROSESSIN ORGANISOINNIN KONSEPTIMALLI. Luonnos mukautuvalle referenssimallille

Tilausvahvistus. Anttolan Urheilijat HENNA-RIIKKA HAIKONEN KUMMANNIEMENTIE 5 B RAHULA. Anttolan Urheilijat

TM ETRS-TM35FIN-ETRS89 WTG

VAASAN YLIOPISTO Humanististen tieteiden kandidaatin tutkinto / Filosofian maisterin tutkinto

NAO- ja ENO-osaamisohjelmien loppuunsaattaminen ajatuksia ja visioita

Vuosi Jukka Rinnevaara Toimitusjohtaja

1. SIT. The handler and dog stop with the dog sitting at heel. When the dog is sitting, the handler cues the dog to heel forward.

Standardit IEC (perustandardi) ja IEC (prosessit)

TM ETRS-TM35FIN-ETRS89 WTG

TAMPEREEN TEKNILLINEN YLIOPISTO Teollisuustalous

Osavuosikatsaus JUKKA RINNEVAARA CEO

Kysymys 5 Compared to the workload, the number of credits awarded was (1 credits equals 27 working hours): (4)

Työsuojelurahaston Tutkimus tutuksi - PalveluPulssi Peter Michelsson Wallstreet Asset Management Oy

Lapuan myöntämä EU tuki SOLUTION asuinalueille omakoti- tai rivitaloa rakentaville

AKKREDITOITU TESTAUSLABORATORIO ACCREDITED TESTING LABORATORY VERKOTAN OY VERKOTAN LTD.

Other approaches to restrict multipliers

Erasmus Charter for Higher Education Hakukierros kevät 2013 Anne Siltala, CIMO

Lab SBS3.FARM_Hyper-V - Navigating a SharePoint site

WindPRO version joulu 2012 Printed/Page :47 / 1. SHADOW - Main Result

Kansainvälisiä tutkimus- ja kehitysprojekteja ekotehokkaan rakennetun ympäristön tuottamiseen, käyttöön ja ylläpitoon

Helsinki Metropolitan Area Council

AKKREDITOITU TESTAUSLABORATORIO ACCREDITED TESTING LABORATORY WE CERTIFICATION OY OPERATOR LABORATORY

Alternative DEA Models

Arkkitehtuuri- ja prosessimallit. Johannes Koskinen

Data protection template

ISSRC Information Systems Security Research Center. University of Oulu, Department of Information Processing Science T.Wiander, M.

Metsälamminkankaan tuulivoimapuiston osayleiskaava

OMINAISUUDET SOVELLUS. Technical data sheet BOAX-II HDG - KIILA-ANKKURI. Mutterin ja aluslevyn kanssa. UK-DoP-e08/0276, ETA-08/0276.

Asiakaspalautteen merkitys laboratoriovirheiden paljastamisessa. Taustaa

National Building Code of Finland, Part D1, Building Water Supply and Sewerage Systems, Regulations and guidelines 2007

LYTH-CONS CONSISTENCY TRANSMITTER

Lisensointikuulumisia - Kustannustehokkuus Oracle lisensoinnissa

EUROOPAN PARLAMENTTI

Returns to Scale II. S ysteemianalyysin. Laboratorio. Esitelmä 8 Timo Salminen. Teknillinen korkeakoulu

7. Product-line architectures

812336A C++ -kielen perusteet,

Tietorakenteet ja algoritmit

TM ETRS-TM35FIN-ETRS89 WTG

Tarkastettavan psykologia

Information on Finnish Language Courses Spring Semester 2018 Päivi Paukku & Jenni Laine Centre for Language and Communication Studies

,0 Yes ,0 120, ,8

OMINAISUUDET

BLOCKCHAINS AND ODR: SMART CONTRACTS AS AN ALTERNATIVE TO ENFORCEMENT

EU:n lääketutkimusasetus ja eettiset toimikunnat Suomessa Mika Scheinin

Viite Komission kirje Asia Suomen vastaus komissiolle kansallisten romanistrategioiden toimeenpanon edistymisestä

Transkriptio:

Inspecta teollisuusautomaation palvelut Kumppanisi turvallisuudessa ja luotettavuudessa IEC 61511 Standardin muutokset Yleistä Epäjohdonmukaisuuksia korjattu Kirjoitusvirheitä korjattu Päivitetty vastaamaan IEC 61508:2010 ed. 2:sta Should vaihdettu shall :ksi monissa kappaleissa. 2

5.2.6. Functional Safety Assessment FSA-vaatimuksia tarkennettu: 5.2.6.1.4 FSA team shall review the work carried out on all phases of the safety life cycle prior to the stage covered by the assessment that have not been already covered by previous FSAs. If previous FSAs have been carried out then the FSA team shall consider the conclu-sions and recommendations of the previous assessments. The stages in the SIS safety life-cycle at which the FSA activities are to be carried out shall be identified during the safety planning 3 5.2.6. Functional Safety Assessment FSA myös muutoksille ja käytön aikana: 5.2.6.1.9 In cases where a FSA is carried out on a modification the assessment shall consider the impact analysis carried out on the proposed modification and confirm that the modification work performed is in compliance with the requirements of IEC 61511. 5.2.6.1.10 A FSA shall also be carried out periodically during the operations and maintenance phase to ensure that maintenance and operation are being carried out according to the assumptions made during design and that the requirements within IEC 61511 for safety management and verification are being met. 4

7.2.2. 7.2.6 Verification Todentamisvaatimuksia tarkennettu: 7.2.2 Where the verification includes testing, the verification planning shall also address the following: a) the strategy for integration of application program and hardware and field devices, b) test scope c) test cases and test data (these will be specific scenarios with the associated data); d) types of tests to be performed; 5 7.2.2. 7.2.6 Verification e) test environment including tools, hardware, all software and required configuration; f) test criteria (e.g., pass/fail criteria) on which the results of the test will be evaluated; g) procedures for corrective action on failure during test; h) physical location(s) (e.g., factory or site); i) dependence on external functionality; j) appropriate personnel; k) management of change; l) non-conformances. 6

7.2.2. 7.2.6 Verification 7.2.3 Non-safety functions integrated with safety functions shall be verified for non-interference with the safety functions. 7.2.4 Verification shall be performed according to the verification planning. 7.2.5 During testing, any modification shall be subjected to an impact analysis which shall determine all SIS components impacted and the necessary re-verification activities. 7.2.6 The results of the verification process shall be available (see 19), including whether the objective and criteria of the tests have been met. 7 8. Process H&RA (Hazard & risk assessment) Tietoturva mukaan vaara- ja riskiarvioon: 8.2.4 A security risk assessment shall be carried out to identify the security vulnerabilities of the SIS. It shall result in: a) a description of the devices covered by this risk assessment (e.g., SIS, BPCS or any other device connected to the SIS); b) a description of identified threats that could exploit vulnerabilities and result in security events (including intentional attacks on the hardware, application programs and related software, as well as unintended events resulting from human error); c) a description of the potential consequences resulting from the security events and the likelihood of these events occurring; 8

8. Process H&RA (Hazard & risk assessment) d) consideration of various phases such as design, implementation, commissioning, operation, and maintenance; e) the determination of requirements for additional risk reduction; f) a description of, or references to information on, the measures taken to reduce or remove the threats. NOTE 1: Guidance related to SIS security is provided in ISA TR84.00.09, ISO/IEC 27001:2013, and IEC 62443:2010. 9 9.3 SIL 4 (2003 versiossa) 2003 versiossa SIL4:ää pyrittiin välttämään. Uudessa versiossa helpommin mahdollinen: 9.2.5 In cases where the allocation process results in a risk reduction requirement of >10 000 or average frequency of dangerous failures>10-8 per hour for a single SIS or multiple SISs or SIS in conjunction with a BPCS protection layer, there shall be a reconsideration of the application (e.g., process, other protection layers) to determine if any of the risk parameters can be modified so that the risk reduction requirement of >10 000 or average frequency of dangerous failures>10-8 per hour is avoided. 10

9.3 SIL 4 (2016 versiossa) 9.2.6 If after further consideration of the application and confirmation that a risk reduction requirement >10 000 or average frequency of dangerous failures>10-8 per hour is still required, then consideration should be given to achieving the safety integrity requirement using a number of protection layers (e.g., SIS or BPCS) with lower risk reduction requirements. If the risk reduction is allocated to multiple protection layers then such protection layers shall be independent from each other or the lack of independence shall be assessed and shown to be sufficiently low compared to the risk reduction requirements. 11 10 SIS safety requirements specification (SRS) AP vaatimukset lisätty SRS:ään: 10.3.3 The application program safety requirements shall be derived from the SRS and chosen architecture (arrangement and internal structure) of the SIS. The application program safety requirements may be located in the SRS or in a separate document (e.g., application program requirements specification). 10.3.4 The application program safety requirements shall be specified for each programmable SIS device necessary to implement the required SIF consistent with the architecture of the SIS. 12

10 SIS safety requirements specification (SRS) 10.3.5 The application program safety requirements specification shall be sufficiently detailed to allow the design and implementation to achieve the required functional safety and to allow a functional safety assessment to be carried out. 13 11.4 Hardware fault tolerance (HFT) Vikasietoisuuteen reitti 2H ja SFF poistettu: 11.4.3 The HFT of the SIS or its SIS subsystems shall be in accordance with; 11.4.5 to 11.4.9 of clause 11 or, the requirements of 7.4.4.2 (route 1H) of IEC 61508-2:2010 or, the requirements of 7.4.4.3 (route 2H) of IEC 61508-2:2010. (route 1H = IEC 61508 fulfilled, route 2H =proven in use) 14

11.4 Hardware fault tolerance (HFT) SFF poistettu standardista 15 11.4 Hardware fault tolerance (HFT) 16

11.4 Hardware fault tolerance (HFT) Vikasietoisuusvaatimukset riippuvat toimintatavasta, ei SFF:stä 17 11.5.2.1 Devices selected for use as part of a SIS with a specified SIL shall be in accordance with IEC 61508-2:2010 and IEC 61508-3:2010 and/or 11.5.3 through 11.5.6, as appropriate. Voidaan hyödyntää systemaattista kyvykkyyttä! 18

11.5.3 Requirements for the selection of devices based on prior use Käyttökokemusten perusteella hyväksi todettavien laitteiden vaatimuksia tarkennettu. 19 11.9 Quantification of random failure Vikaantumislaskentaa tarkennettu: 11.9.3 The reliability data used when quantifying the effect of random failures shall be credible, traceable, documented, justified and shall be based on field feedback from similar devices used in a similar operating environment. 11.9.4 The reliability data uncertainties shall be assessed and taken into account when calculating the failure measure. 11.9.5 If, for a particular design, the target failure measure for the relevant SIF is not achieved then: (4 kohtaa vikaantumisen parantamiseen) 20

12 SIS Application Program Development Sovellusohjelmiston kehittämiseen liittyvä kappale 12 uudelleen muotoiltu. Elinkaareen liittyviä vaatimuksia siirretty kappaleeseen 6. V-malli poistettu ja siirretty esimerkiksi osaan 2. Verifiointivaatimuksia lisätty 21 16 SIS operation and maintenance Turvatoimintojen ohittamiseen varmistusvaatimuksia: 16.2.3 Operation procedures shall be made available. Compensating measures that ensure continued safety while the SIS is disabled or degraded due to bypass (repair or testing) shall be applied with the associated operation limits (duration, process parameters, etc.). The operator shall be provided with information on the procedures to be applied before and during bypass and what should be done before the removal of the bypass and the maximum time allowed to be in the bypass state. This information shall be reviewed on a regular basis. 22

16 SIS operation and maintenance 16.2.4 Continued process operation with a SIS device in bypass shall only be permitted if a hazards analysis has determined that compensating measures are in place and that they provide adequate risk reduction. Operating procedures shall be developed accordingly. 23 Toiminnallisen turvallisuuden standardit, päivitystilanne

Toiminnallisen turvallisuuden standardit, päivitystilanne IEC 61508: Kansallisten komiteoiden kommentit saatu. Kommentteja käsitellään osien 1/2 ja 3 komiteoiden alatyöryhmissä. DIS:n julkaisuaikataulua ei päätetty IEC 61508-1/2 kokous oli Irlannissa Limeric:ssä 1.-2.3.2018 (En osallistunut) IEC 61508-3 kokous oli Irlannissa Limeric:ssä 27.-28.2.2018 Seuraavat kokoukset heinäkuun alussa Saksassa IEC 61508-3 Olio-ohjelmointi turvallisuuteen liittyvissä järjestelmissä (Eli MT61508-3 TS 63177 ED 1, Requirements for object oriented software in safety-related systems) Frankfurtissa 6.-7.3.2018 ja 16.-17.4.2018 IEC TC 65 AHG1 TR Functional Safety & Cybersecurity IEC 62879/Ed.1 Safety and Human Factors (Viimeisin kokous 2017 joulukuu) 25 Toiminnallisen turvallisuuden standardit, päivitystilanne IEC 61511: Virallisen työn osuus on päättynyt standardin julkaisemiseen Ryhmä tekee ohjeistusta standardin soveltamisesta mm. IEC 61511-0 TR Pohtii seuraavan version parannuksia. Seuraava kokous Firenze Italia 22.-24.5.2018 26