InfraBIM, what now and what next 22.3.2013

Samankaltaiset tiedostot
TIEKE Verkottaja Service Tools for electronic data interchange utilizers. Heikki Laaksamo

ProAgria. Opportunities For Success

Tekes the Finnish Funding Agency for Technology and Innovation. Copyright Tekes

Network to Get Work. Tehtäviä opiskelijoille Assignments for students.

The role of 3dr sector in rural -community based- tourism - potentials, challenges

7.4 Variability management

Rakentamisen 3D-mallit hyötykäyttöön

Skene. Games Refueled. Muokkaa perustyyl. for Health, Kuopio

DEVELOPMENT AND UTILIZATION OF OPEN INFORMATION TRANSFER FORMATS IN INFRASTRUCTURE SECTOR

Capacity Utilization

Helsinki Metropolitan Area Council

On instrument costs in decentralized macroeconomic decision making (Helsingin Kauppakorkeakoulun julkaisuja ; D-31)

Miehittämätön meriliikenne

Tarua vai totta: sähkön vähittäismarkkina ei toimi? Satu Viljainen Professori, sähkömarkkinat

Efficiency change over time

Building Information Model (BIM) promoting safety in the construction site process. SafetyBIM research project 10/2007 2/2009. (TurvaBIM in Finnish)

Augmented Reality (AR) in media applications

Green Growth Sessio - Millaisilla kansainvälistymismalleilla kasvumarkkinoille?

HITSAUKSEN TUOTTAVUUSRATKAISUT

RAIN RAKENTAMISEN INTEGRAATIOKYVYKKYYS

ECSEL - Electronic Components and Systems for European Leadership

Copernicus, Sentinels, Finland. Erja Ämmälahti Tekes,

16. Allocation Models

Sisällysluettelo Table of contents

National Building Code of Finland, Part D1, Building Water Supply and Sewerage Systems, Regulations and guidelines 2007

Use of spatial data in the new production environment and in a data warehouse

VUOSI 2015 / YEAR 2015

Keskeisiä näkökulmia RCE-verkoston rakentamisessa Central viewpoints to consider when constructing RCE

Choose Finland-Helsinki Valitse Finland-Helsinki

Other approaches to restrict multipliers

AYYE 9/ HOUSING POLICY

Hankkeiden vaikuttavuus: Työkaluja hankesuunnittelun tueksi

Suomen 2011 osallistumiskriteerit

Collaborative & Co-Creative Design in the Semogen -projects

NAO- ja ENO-osaamisohjelmien loppuunsaattaminen ajatuksia ja visioita

Social and Regional Economic Impacts of Use of Bioenergy and Energy Wood Harvesting in Suomussalmi

Innovative and responsible public procurement Urban Agenda kumppanuusryhmä. public-procurement

MEETING PEOPLE COMMUNICATIVE QUESTIONS

Olet vastuussa osaamisestasi

7. Product-line architectures

MUSEOT KULTTUURIPALVELUINA

TietoEnator Pilot. Ari Hirvonen. TietoEnator Oyj. Senior Consultant, Ph. D. (Economics) presentation TietoEnator 2003 Page 1

Making use of BIM in energy management

KOMPETENSSIT. Koulutus Opiskelija Tuuttori. Business Information Technologies. NQF, Taso 6 - edellyttävä osaaminen

RAKENNETUN(OMAISUUDEN( DIGITALISAATIO

Tork Paperipyyhe. etu. tuotteen ominaisuudet. kuvaus. Väri: Valkoinen Malli: Vetopyyhe

Käytännön kokemuksia osallistumisesta EU projekteihin. 7. puiteohjelman uusien hakujen infopäivät 2011

Alternative DEA Models

Smart specialisation for regions and international collaboration Smart Pilots Seminar

FROM VISION TO CRITERIA: PLANNING SUSTAINABLE TOURISM DESTINATIONS Case Ylläs Lapland

The CCR Model and Production Correspondence

Integraatio ja yhteistoimintamallit

TIETEEN PÄIVÄT OULUSSA

Automaatiojärjestelmän hankinnassa huomioitavat tietoturva-asiat

Uusi Ajatus Löytyy Luonnosta 4 (käsikirja) (Finnish Edition)

Tuloksia ja kokemuksia / results and experiences

Improving advisory services through technology. Challenges for agricultural advisory after 2020 Jussi Juhola Warsaw,

On instrument costs in decentralized macroeconomic decision making (Helsingin Kauppakorkeakoulun julkaisuja ; D-31)

WP3 Decision Support Technologies

USING AND ACQUIRING BIM IN SENAATTI-KIINTEISTÖT

General studies: Art and theory studies and language studies

Kansainvälisiä tutkimus- ja kehitysprojekteja ekotehokkaan rakennetun ympäristön tuottamiseen, käyttöön ja ylläpitoon

Kokonaisarkkitehtuurin omaksuminen: Mahdollisia ongelmakohtia ja tapoja päästä niiden yli

WAMS 2010,Ylivieska Monitoring service of energy efficiency in housing Jan Nyman,

Infrastruktuurin asemoituminen kansalliseen ja kansainväliseen kenttään Outi Ala-Honkola Tiedeasiantuntija

Teacher's Professional Role in the Finnish Education System Katriina Maaranen Ph.D. Faculty of Educational Sciences University of Helsinki, Finland

LUONNOS RT EN AGREEMENT ON BUILDING WORKS 1 THE PARTIES. May (10)

Security server v6 installation requirements

Benchmarking Controlled Trial - a novel concept covering all observational effectiveness studies

LYTH-CONS CONSISTENCY TRANSMITTER

HUMAN RESOURCE DEVELOPMENT PROJECT AT THE UNIVERSITY OF NAMIBIA LIBRARY

Suomen JVT- ja Kuivausliikkeiden Liitto ry The Association of Finnish Damage Restoration Companies

anna minun kertoa let me tell you

On instrument costs in decentralized macroeconomic decision making (Helsingin Kauppakorkeakoulun julkaisuja ; D-31)

Security server v6 installation requirements

Käytön avoimuus ja datanhallintasuunnitelma. Open access and data policy. Teppo Häyrynen Tiedeasiantuntija / Science Adviser

Windows Phone. Module Descriptions. Opiframe Oy puh Espoo

CASE POSTI: KEHITYKSEN KÄRJESSÄ TALOUDEN SUUNNITTELUSSA KETTERÄSTI PALA KERRALLAAN

Industry known for competence & ability to solve complex engineering challenges

Verkkokauppatilasto Perustietoa verkkokauppaseurannasta sekä verkko-ostaminen 2014/H1

ATLAS-kartan esittely - Peli palveluiden yhteiskehittämisen menetelmistä Päivi Pöyry-Lassila, Aalto-yliopisto

EARLY LEARNING PLAN / ENGLANTI VARHAISKASVATUSSUUNNITELMA

EVE-Electric Vehicle Systems Programme status

Millaisia mahdollisuuksia kyberturva tarjoaa ja kenelle? Ja mitä on saatu aikaan?

Constructive Alignment in Specialisation Studies in Industrial Pharmacy in Finland

Aalto-yliopiston laatujärjestelmä ja auditointi. Aalto-yliopisto Inkeri Ruuska, Head of Planning & Management Support

Indoor Environment

Returns to Scale II. S ysteemianalyysin. Laboratorio. Esitelmä 8 Timo Salminen. Teknillinen korkeakoulu

FinFamily PostgreSQL installation ( ) FinFamily PostgreSQL

NBS projektin tilannekatsaus. Tasevastaavapäivä Pasi Aho

Rakentamisen näkymät EU-alueella ja Suomessa

Space for work, meetings and events. Expert Services for knowledge intensive and growth oriented SME s

Aalto Service Factory

Information on preparing Presentation

Information on Finnish Language Courses Spring Semester 2018 Päivi Paukku & Jenni Laine Centre for Language and Communication Studies

BDD (behavior-driven development) suunnittelumenetelmän käyttö open source projektissa, case: SpecFlow/.NET.

A new model of regional development work in habilitation of children - Good habilitation in functional networks

Jussi Klemola 3D- KEITTIÖSUUNNITTELUOHJELMAN KÄYTTÖÖNOTTO

1. SIT. The handler and dog stop with the dog sitting at heel. When the dog is sitting, the handler cues the dog to heel forward.

Transkriptio:

InfraBIM, what now and what next 22.3.2013

Presentation 1. FTA 2. Infra FINBIM 3. Case stady 4. Steps 22.3.2013 Tiina Perttula 2 Investointi

The Finnish Transport Agency FTA Is a multidisciplinary expert organisation specialising in transport Responsible for the Finnish transport infrastructure and the overall development of Finland s transport system: railway, road, maritime Annually purchases maintenance, planning, surveying and other similar services for about 1.6 billion euros, which represents about one-third of Finland s infrastructure field Value of the property about 19 billion euros Operates under the jurisdiction of the Ministry of Transport and Communications Employs 700 professionals FTA coordinates also ELY-centers (Centre for Economic Development, Transport and the Environment ) 22.3.2013 Tiina Perttula 3 Investointi

Infra FINBIM 2010-2013 One of six work packages in Built Environment Process Re-engineering (PRE) research program, is financied by companies, FTA and Tekes (The Finnish Funding Agency for Technology and Innovation) The goal is to develop and realize a new information modelling and automation based process and model. In the process the needed intelligent and information contents of different models can be created, used and utilized throughout the infra construction, rehabilitation and maintenance process and work phases. The process reaches the whole life cycle of the main infra products, i.e. highways, railways and bridges. The aim is to create and establish a systemic change into infra sector in Finland, which is needed to enable and support the comprehensive development and utilization of information modelling and automation potentials and possibilities. Also, the aim is to develop international competiveness into Finnish infra companies, other infra participants and research organizations. Budget 2010 2013 about 6 M 22.3.2013 Tiina Perttula 4 Investointi

Infra FINBIM Vision Year 2014 large owners of infra structures are ordering just model-based services, which are used in all stages of project, beginning from order of design and ending to maintenance stage. New way of working All actors in the same boat: infra owners, designers, contractors, software producers, universities and research institutes Common working groups and open co-operation Annual developing plans and reporting for all partners Joint ownership of new knowledge Large public funding by Tekes Main contents Experiences from case projects Developing BIM-based processes for design and construction Developing procurement Developing general guidelines for BIM Developing LandXML-based InfraModel2 requirements for data transfer 22.3.2013 Tiina Perttula 5 Investointi

Infra FINBIM: benefits to be achieved Design and construction processes which are significantly more efficient than at present The total optimisation of chosen solutions User-Centeredness: 1. Compatibility of different designs, which is better than at present, and digital realtime control 2. Improved compatibility of different functions 3. Easing of cooperation in design, implementation and in the exchange of information 4. More reliable sources of information for the different stages of tender calculation; less risks and contradictions during work 5. The development of new methods through increased joint activities between the parties More efficient, error-free and faster operations for both the work site and the design Planning of savings and the total construction costs The development of an internationally competitive design and implementation process and new business areas Exploitation of a ready product in maintenance, development and in the basic repairs of a project. 22.3.2013 Tiina Perttula 6 Investointi

1 6 2 Main focus in Infra FINBIM: 1. Initial Data 2. Design 3. Construction 4. Quality control 5. Maintenance 6. Everyday work 5 3 4 22.3.2013 Tiina Perttula 7 Investointi

InfraFINBIM what have been done Lot of case studies were new ideas are tested FTA have many projects Most valuable achievements: Specification Inframodel 3 Open standard to transfer data between different design phase or to construction phase Transferring data also between different software Terminology Guidelines Terminology Guidelines Standards 22.3.2013 Tiina Perttula 8 Investointi

Esimerkki Inframodel3:n tietosisällöstä Projekti, sovellus Maastomalli pisteet/viivat - kolmiot Saven alapinta pisteet kolmiot Tien rakennepinnat: viivamalli pintamalli kolmiopinta Meluvalli Aita - kaide Kaivot putket Valaisinpylväs, jalusta Liikennemerkkipylväs, jalusta Rata+: km-paalutus, kallistus, vaihdekirjasto Built Environment Process Reengineering 18.2.2013 Page 23

Esimerkki Inframodel3:n tietosisällöstä Yläpinnan viivamalli Rakenteiden viivamallit Saven alapinta Rakenteen alapinta Koko malli Rakennepinnat-aita-kaide Rakenteen yläpinta Maasto, saven alapinta Kuivatus, jalustat Built Environment Process Reengineering 18.2.2013 Page 24

Terminology 22.3.2013 Tiina Perttula 9 Investointi

22.3.2013 Tiina Perttula 10 Investointi

Guidelines www.infrabim.fi 22.3.2013 Tiina Perttula 11 Investointi

Short way Target is that once planned or modeled information doesn t disappear or it doesn t have to change in different format during different project phases. Planning in different phases Building Maintenance 22.3.2013 Tiina Perttula 12 Investointi

22.3.2013 Tiina Perttula 13 Investointi

Information accuracy Initial data, existing structures like roads, pipelines, pile slab, Accuracy of initial data plays important role. Accuracy on design model depend on accuracy of initial data There is no guidelines about which kind on data should modeled in early stage. Common sense can be used and if data is needed in some point anyway, it doesn t change when time goes by or it plays important role it should be modeled as soon as possible. Model report plays important role. Model report is description of all data. It answers question like: Where data come from Is it modeled from the drawings Is the coordinate system original or is it change Is the made some kind of assumptions when modeled the data 22.3.2013 Tiina Perttula 14 Investointi

The purpose is that the design starts with a so-called initial data model which get more accurate during the design progresses. In the end of the design phase the initial data model is put together again and transfer to the next design phase. Initial data model Design Phase Design model Updated initial data model Next design phase Updated initial data 22.3.2013 Tiina Perttula 15 Investointi

Some projects whit BIM Kokkola-Ylivieska railroad, RU 3 30 km double track Procurement model is Design Build Long period 2013-2017 ->technology that is not possible now might be possible later. How to write requirements that enable development Initial data model is made before tender phase an are given to the service provider. Also original drawings are given. Aims for tendering phase Visualized the construction site Getting information about shearing models and data via internet Collect feedback from service provider Aims for planning and construction Visualized the csite onstruction Getting information about shearing models and data via internet 22.3.2013 Tiina Perttula 16 Investointi

Riihimäen kolmioraide, railroad Short, only 1.8 km Special feature: Railroad tunnel First BIM based procuremt Descripiton of requirements are already written Hamina-Vaalimaa Model based planning, also ordinary documents co operation via models with interest group Connected to VIREsmart R&D project (virtual reality) 22.3.2013 Tiina Perttula 17 Investointi

22.3.2013 Tiina Perttula 18 Investointi

Challenges Future archives? We still need 2D images. These can be more conceptual. Detail and working drawing could present in information models Who owns the original data and the native model? Software development through hole system. Model based quality control The entire life-cycle management Commonly accepted rules have not yet been formed 22.3.2013 Tiina Perttula 19 Investointi

22.3.2013 Tiina Perttula 20 Investointi

Kokkola-Ylivieska 22.3.2013 Tiina Perttula 21 Investointi

E18 22.3.2013 Tiina Perttula 22 Investointi

Liikenneviraston organisoituminen Liikenneviraston tietomalliryhmä Tiina Perttula, pj Timo Tirkkonen, koordinointi Infra Teema, Infra TM Matti Ryynänen, tiehankkeet, suunnittelu, IM 3 Seppo O. Mäkinen, suuret hankkeet, rakentaminen Erkki Mäkelä, ratahankkeet, Esa Sirkiä, vesiväylähankkeet Seppo Paukkeri, vesiväylähankkeet Heikki Myllymäki, Sillat ja taitorakenteet Sami Mäkinen, ICT kehittäminen Tomi Mykkänen, ICT kehittäminen Virpi Kangasniemi, Juridiikka 22.3.2013 Tiina Perttula 23 Investointi