BimCITY BIMCity Simulation platform for IFC based technologies and solutions.
BIMCity BIMCity Simulation platform for IFC based technologies and solutions. BIMCity is a simulation and testing environment for contet based virtual city. Interfaces between BIM, GIS, Infra data and Internet databases. Test environment elements Buildings Street and roads Pipes, cabels Town plans Land registers Building license Climate and geographical data Pedestrian and vehicle trafic information Other municipal databases and registers Etc. RYM 13.1.2010 2
RYM SHOK Follow-up -Group AE Partners Oy Arkkitehtitoimisto Helin & Co Oy Acons FCG Finnish Consulting Group Oy Metropolia Ammattikorkeakoulu Pöyry Rapal Oy Verstas-arkkitehdit Senaatti Solibri Oy SRV Yhtiöt Oyj VTT WSP Finland Oy Ympäristöministeriö Laurea Aalto University School of Science and Technology RYM 13.1.2010 3
BIMCity Priciple Testing and Research Areas BIM, GIS, InfraRYL etc. integration Common data structures and interfaces Common notions, dictionaries Vertical and horizontal eploitation Level of Detail definitions RYM 13.1.2010 4
BIM Integration Incomplete/Absent Buildings Structures Eisting- Designed Climate and geographical data GISTown plans Land registers LandXML-KuntaGML InfraTM Pipes -- Cabels RYM 13.1.2010 5
Collaboration vs. Information Leakage Information is non-uniform and spread over each field and sector Overlapping operations (internal -> eternal) Unable to eploit new techniques IFC etc. widely Need for simulation testbed without real world limitions Each sector has own models and methods RYM 13.1.2010 6
Nykytila BIM Case Rakennuslupa Rakennusmääräykset Rakennuslupalomake Piirustukset Tarkastukset ja Valvonta Muut tiedot CO 2 Arkistointi BimCITY BIM Earth-BIM Virtual FINLAND BimCITY CityGML IFC RYM 13.1.2010 7
Case CO 2 ja energialaskenta Rakennus BIM BimCITY ILMASTONMUUTOS Laskenta tietomallin pohjalta Paikalliset tekijät Tuuli, naapurit, puusto ym. Paikalliset määräykset Materiaalit ja rakennusosat Globaali sijainti BimCityn kautta Liikenne Vertailu esim. naapureihin tai vastaaviin kohteisiin Tuotetietokannat -Osa tiedoista tietomallissa RYM 13.1.2010 8
Case Liikenne Rakennus BIM Vaikutus liikenteeseen -esimerkiksi kauppakeskus kohteen tiedot asiakasvirrat materiaalitoimitukset huolto jne. BimCITY Naapurit Liikenneväylät ja katuverkko Ruuhkasimulaatio Onnetteomuussimulaatio Ratkaisun päästövertailu CO2 RYM 13.1.2010 9
Title (ma 10 words) Keywords (ma 5) BIMCity Simulation platform for IFC based technologies and solutions IFC, simulation, VirtualTown, integration, multilateral services Time to industry Short term Medium term Long term Lifecycle Stage Design Construction Mgmt. Services Ownership & Operations Focus Area People & Networks Business Models Work Processes Integration Technologies Industrial problem / relevance (Why is this action important? What are the main business drivers?) Technological objectives (What is the measurable achievement / innovation / R&D progress beyond the state of the art?) Approach (How will the problem be solved: base-line technology + methodology / approach + necessary competencies)? Results (What tangible, applications / tools, methods etc. will be developed / etended?) Information is non-uniform and spread over each field and sector Overlapping operations (internal -> eternal) Unable to eploit new techniques IFC etc. widely Need for simulation testbed without real world limitions Offer simulation environment Common data structures and interfaces Common notions, dictionaries Vertical and horizontal eploitation Common definitions, (dictionaries, structures and objectives) Application platform development Concepts without real world limitations Test platform built and ready to use Competencies (What are the required competencies in terms of skills and knowhow required of the participants?) State and municipal authorities Town planners and consultants Software developers Kunta GML Resources & Duration Beneficiaries (Who are the main beneficiaries of the results?) Industrial Impacts (What potential benefits will follow from the use of results?) Metrics (How can the impact be measured in tangible terms?) Follow-up actions (What else is required to achieve the benefits?) 1 000 000 Budget (Euros) 100 Effort (Person-months) 24 Duration (Months) Construction industry Cost effective methods New horizontal concepts Multilateral services Each field has own scale according to their practices Co-operative processing and commitment Better environment (CO2) New products and concepts Less idle work Contact information of the proposer Name (First, Last) 1.12.2009 Organisation Heikki Lonka FCG Finnish Consulting Group Oy Email RYM 13.1.2010 10 heikki.lonka@fcg.fi
BimCITY Work on progress BIMCity Simulation platform for IFC based technologies and solutions RYM 13.1.2010 11