Instruction of Installation of 0-30V Stabilized Voltage Supply

Samankaltaiset tiedostot
dupol.eu - WIFI based remote gate control unit - Hungarian product

dupol.eu - smart home product comparison

Air purification in gene laboratories

Asuntoreformi 2018

LYTH-CONS CONSISTENCY TRANSMITTER

National Building Code of Finland, Part D1, Building Water Supply and Sewerage Systems, Regulations and guidelines 2007

Capacity Utilization

On instrument costs in decentralized macroeconomic decision making (Helsingin Kauppakorkeakoulun julkaisuja ; D-31)

SC-3G alarm monitoring communicator - dupol.eu

Smart access control.

On instrument costs in decentralized macroeconomic decision making (Helsingin Kauppakorkeakoulun julkaisuja ; D-31)

WIFI Garage Door and Gate Opener. Internet base remote control with WIFI connection

Uusi Ajatus Löytyy Luonnosta 4 (käsikirja) (Finnish Edition)

INSTALLATION INSTRUCTION ASENNUSOHJE PEM ENGLISH SUOMI CURRENT LIMITING DEVICE VIRTAA RAJOITTAVA SUOJA SDI & SDI46.

anna minun kertoa let me tell you

Choose Finland-Helsinki Valitse Finland-Helsinki

Exercise 1. (session: )

You can check above like this: Start->Control Panel->Programs->find if Microsoft Lync or Microsoft Lync Attendeed is listed

1. SIT. The handler and dog stop with the dog sitting at heel. When the dog is sitting, the handler cues the dog to heel forward.

Installation instruction PEM

FYSE301(Elektroniikka(1(A3osa,(kevät(2013(

MEETING PEOPLE COMMUNICATIVE QUESTIONS

The CCR Model and Production Correspondence

SAGA 150. Asennusohjeet. Mittaa oven korkeus. Piirrä seinään oven kiinni -päätyyn seinäkannattimen kohdalle vaakaviiva korkeudelle ovi + 75mm + 20 mm.

Secto Design Oy Kauppalantie Kauniainen Finland tel fax info@sectodesign.fi

KONEISTUSKOKOONPANON TEKEMINEN NX10-YMPÄRISTÖSSÄ

Returns to Scale II. S ysteemianalyysin. Laboratorio. Esitelmä 8 Timo Salminen. Teknillinen korkeakoulu

RULLARADAT RULLADAT ROLLER TABLES

TUOTTEEN TEKNISET TIEDOT 250/ /700 P5

MISKA 1514 MISKA % WOOL 50% ACRYLIC 100% WOOL

Information on preparing Presentation

Installation instruction PEM

1. Liikkuvat määreet

On instrument costs in decentralized macroeconomic decision making (Helsingin Kauppakorkeakoulun julkaisuja ; D-31)

Introduction Getting Started

Lataa History According to Cattle. Lataa

Recirkulering. El-tilslutning. Kontrolpanel. Dansk. Timerfunktion

Lab SBS3.FARM_Hyper-V - Navigating a SharePoint site

Tarua vai totta: sähkön vähittäismarkkina ei toimi? Satu Viljainen Professori, sähkömarkkinat

SpeechMike III sarjan sanelumikrofonien (mallit LFH3200 ja LFH3220) yhteensopivuus SpeechMagic Executive saneluohjelman kanssa

Efficiency change over time

S SÄHKÖTEKNIIKKA JA ELEKTRONIIKKA

Särmäystyökalut kuvasto Press brake tools catalogue

Gap-filling methods for CH 4 data

VAROITUKSET. Älä pura laitetta osiin.

Metsälamminkankaan tuulivoimapuiston osayleiskaava

Miten koulut voivat? Peruskoulujen eriytyminen ja tuki Helsingin metropolialueella

make and make and make ThinkMath 2017

FinFamily Installation and importing data ( ) FinFamily Asennus / Installation

TW- WLAN ac SOVITTIMEN ASENNUSOHJE

Nuku hyvin, pieni susi -????????????,?????????????????. Kaksikielinen satukirja (suomi - venäjä) ( (Finnish Edition)

Data protection template

Box 1. Things you have/ Pakkaus sisältää. x 4 x 16 x 4 x mm. 1700mm. 300mm 1. Things you should know / Sinun Tulee Tietää

The Viking Battle - Part Version: Finnish

IFAGG WORLD CUP I, CHALLENGE CUP I and GIRLS OPEN INTERNATIONAL COMPETITION 1 st 2 nd April 2011, Vantaa Finland

( ( OX2 Perkkiö. Rakennuskanta. Varjostus. 9 x N131 x HH145

Suomen Talonpoikaiss Dyn Keskustelup Yt Kirjat, Issue 1... (Finnish Edition) Click here if your download doesn"t start automatically

Tynnyrivaara, OX2 Tuulivoimahanke. ( Layout 9 x N131 x HH145. Rakennukset Asuinrakennus Lomarakennus 9 x N131 x HH145 Varjostus 1 h/a 8 h/a 20 h/a

Spot-valaisimet. Made in Finland. Pidätämme oikeuden tuotemuutoksiin.

Salasanan vaihto uuteen / How to change password

TM ETRS-TM35FIN-ETRS89 WTG

Miksi Suomi on Suomi (Finnish Edition)

7.4 Variability management

TM ETRS-TM35FIN-ETRS89 WTG

TM ETRS-TM35FIN-ETRS89 WTG

Kylänetti projektin sivustojen käyttöohjeita Dokumentin versio 2.10 Historia : 1.0, 1.2, 1.6 Tero Liljamo / Deserthouse, päivitetty 25.8.

TUOTEPERHEEN TEKNISET TIEDOT OPTOTRONIC

TM ETRS-TM35FIN-ETRS89 WTG

TM ETRS-TM35FIN-ETRS89 WTG

ALOITUSKESKUSTELU / FIRST CONVERSATION

SSTY:n EMC-seminaari. EMC ja sähköisten lääkintälaitteiden standardit. Ari Honkala SESKO ry

WindPRO version joulu 2012 Printed/Page :42 / 1. SHADOW - Main Result

4x4cup Rastikuvien tulkinta

INSTALLATION INSTRUCTION ASENNUSOHJE PEM SJTK31 SJTK46 ENGLISH SUOMI

TM ETRS-TM35FIN-ETRS89 WTG

Owner s Manual GREE Electric Appliances,Inc.of zhuhai

Matkustaminen Majoittuminen

Peltorobotin akselimoduulin kontrolleri

( ,5 1 1,5 2 km

Matkustaminen Majoittuminen

Elhah listavalaisin. Made in Finland. Pidätämme oikeuden tuotemuutoksiin.

03 PYÖRIEN SIIRTÄMINEN

GPRS-lisäpalvelu INTERNET-ASETUKSET

Tökötti eli koivuntuohiterva Birch bark tar

Roadbook

16. Allocation Models

TM ETRS-TM35FIN-ETRS89 WTG

FinFamily PostgreSQL installation ( ) FinFamily PostgreSQL

SAVONIA UAS PRINTING INSTRUCTIONS

TM ETRS-TM35FIN-ETRS89 WTG

TM ETRS-TM35FIN-ETRS89 WTG

WindPRO version joulu 2012 Printed/Page :47 / 1. SHADOW - Main Result

C++11 seminaari, kevät Johannes Koskinen

Uusi Ajatus Löytyy Luonnosta 3 (Finnish Edition)

PR SARJA ASENNUS JA KYTKENTÄ

Mikkeli (Ristiina) ry , Lepasaar Marko

amkbyod-tulostaminen Huittisten ja Kankaanpään kampuksilla / BYOD printing in Huittinen and Kankaanpää campuses

Secto 4200 pendant natural birch, black or white laminate, walnut veneer

PAINEILMALETKUKELA-AUTOMAATTI AUTOMATIC AIR HOSE REEL

Tietorakenteet ja algoritmit

Transkriptio:

Instruction of Installation of 0-30V Stabilized Voltage Supply This is a high quality stabilized voltage supply with which the voltage can be regulated continuously, and the range in which to regulate the voltage is 0-30V. It even contains a current limit circuit which can effectively control the output current from 2mA to 3A with the ability to regulate the current continuously, and this unique feature makes this device an indispensably powerful tool in the circuit lab. With this feature, the current used in the laboratory could be limited within the typical maximum working range. You could turn on the power without hesitation, and never have to feel distressed about the damage of the circuit caused by high current due to device failure or installation error. Technical Specifications: Input Voltage: 24V alternating (max) Input Current: 3A (max) Output Voltage: 0-30V, could be regulated continuously

Output Limit Current: 2mA-3A, could be regulated continuously Output Voltage Ripple: 0.01% (max) PCB size: 84*84 mm Features: All components are in inline-pin package that is easy to install and repair. It is easy to regulate the output voltage. The status in which the output current is limited could be displayed through LED. If the output current exceeds the limit the device will automatically enter into constant current mode, which provides a thorough safeguard against overload current or any possible failure. List of Components: R1=2.2K 1W R2=82R C4=0.1uF(104) C5=0.22uF(224) R3=220R C6=100P (101) R4=4.7K R5, R6, R13, R20, C7=10uF/50V C8=330P (331) R21=10K

R7=0.47R 5W C9=100P (101) R8,R11=27K R9,R19=2.2K R10=270K R12,R18=56K R14=1.5K D1,D2,D3,D4=1N5408 D5,D6=1N4148 D7,D8=5.1V ZD D9,D10=1N4148 D11=1N4004 R15,R16=1K Q1=9014 R17=33R Q2=2SD882 R22=3.9K Q3=9015 RV1=100K 3296W P1,P2=10K B C1=3300uF/50V Q4=2SD1047 U1,U2,U3=TL081 D12=LED C2,C3=47uF/50V Installation Steps: Please follow the sign on PCB to install resistors, diodes, etc. The resistance value should be checked by multi-meter before installation. Please also be aware of the size and installation direction of the diodes.

Please install the other components from lower and smaller ones.

Please pay attention to the direction in which to install the integrated circuit.

The potentiometer could be placed directly onto PCB, and could also be lined onto the board through its socket and wires. Potentiometer tagged with A is the current limit potentiometer and V is the voltage potentiometer. The voltage potentiometer could be substituted by 10K multi turn wire-wound potentiometer at your own will, with which you could adjust in a more accurate way. After the installation, please double check that everything is in its place, and then you can start the power and test the device. Please make sure that you have installed cooling fin of considerable size on Q4 (D1047) before starting the power, and the cooling fin should be insulated from the circuit. If the cooling fin is not sizable enough, the cooling fan is thus a must, for which a 24V socket has been kept for this purpose on the

board. Circuit Conditioning 1.Set the voltage potentiometer (a 10K potentiometer tagged V) at its minimum position (rotate counter clock-wisely to the min), adjust RV1 (100K rheostat) and make the output voltage to 0V (you may come across negative voltage when adjusting, so please use digital multi-meter). There is no need to adjust the max output voltage, and the max output voltage is around 31V when input with 24V alternating power.

2.Current Calibration Connect the load resistance to the output point, for example, 10Ω (make sure there is enough power), and the current potentiometer set at its max and the voltage potentiometer at its min, turn on the device, build up the voltage to 1V slowly, rotate the current potentiometer counterclockwise till the LED begin to emit light, at which point the current of the circuit is limited at 0.1A and the position could be marked. Adjust to 2V, 5V, 10V, 20V,30V successively, and you could calibrate different input current, the formula is: I=U/R. For example, if the load of 10Ω is used, and U at 30V, I=3A(max output). You could substitute other load resistance with different values, but please make sure there is enough power and cooling. As the picture shown below, the voltage is 10V, load resistance is 10 Ω, LED is on, and now the current potentiometer is at the position of 1A, the circuit turns into the constant current mode, if you adjust the voltage potentiometer at this point, you will see that the voltage will not increase and the current will be limited at 1A.

Attentions: 1.The output of the transformer is single 24V or dual 12V (same as 24V), and the power could be determined according to your need. If a full load output (30V3A) is needed, the power of the transformer should be greater than 90W. The circuit must be connected to 24V alternating current power, and direct current is forbidden. 2.Please make sure that the cooling fin is insulated from the circuit when it is installed on Q4 (D1047). The circuit is of a linear stabilized electricity power, and the power dissipation of Q4 is at a relatively high level, thus please

ensure that D1047 has a good cooling effect. 3.Making of a power supply involves high current and high voltage. Any error in installation could lead to unexpected danger, so please double check the component type and install correctly. Circuit diagram: