VTT ja tuulivoiman t&k Tuulivoiman Workshop, Pasila 7.11.2013 Esa Peltola, johtava tutkija, VTT
2 VTT:n palvelut tuulivoimaan liittyvää toimintaa kaikilla lohkoilla
3 WIND POWER KEY COMPETENCES Solutions for wind turbines in cold climate Blade ice prevention systems Instrumentation and measurements in cold climate Loads and performance in icing conditions (onshore & offshore) Field measurements incl. Accredited power performance measurements Grid and energy system integration studies Grid and system integration and smart grids Wind power impacts on electricity markets Modelling of short term production forecasting Market foresight and road mapping Simulation-based design and experimental facilities Wind assessment and wind farm optimisation Turbine design and performance field and research facilities Radar studies, noise research Mechanical testing of substructures and materials Icing wind tunnel Future innovative solutions Preventive condition monitoring and service life assessment Using shape memory alloys for active blade profile control
4 Perusteet tuulivoimamarkkinoiden globaalille kasvulle eivät ole hävinneet Sähkön tarve yli kaksinkertaistuu vuoteen 2050 21,5 mrd MWh 2010 48 54 mrd MWh 2050 Kasvihuonekaasuja pitää rajoittaa 46 70 % investoinneista uusiutuviin (tuuli, aurinko, vesi) Tuontipolttoaineriippuvuuden vähentäminen Tuulivoima Tuotanto 12X vuoden 2010 tasosta riippuu melko vähän skenaariosta Vuotuinen investointimarkkina ~4X nykytaso (lineaarinen kapasiteetin kasvu + vanhan kapasiteetin uusiminen) O&M-markkina kasvaa likimain tuotannon suhteessa yhtä suureksi kuin investointimarkkina nyt
5 IEA Wind Technology Road Map 2013
Total installed and forecasted capacity in Cold Climates Cumulative installed capacity by end of 2012 [MW] Forecasted capacity 2013-17 [MW] Low temperature Light icing: safety risk, some economic risk Moderate to heavy icing: economic and safety risk Low temperature Light icing: safety risk, some economic risk Moderate to heavy icing: economic and safety risk 18,945 41,079 11,478 20,025 22,083 8,003 Total 69,000 (*) Total 45,000 50,000 (*) The total capacity is less than the sum of individual capacities because some of the sites have both low temperatures and icing conditions. Vrt: Globaali offshore-tuulivoimamarkkina 2013-17 Offshore Report 2013 saman lähteen mukaan10,600 MW World Market Update 2012 March 2013 Page 6 www.navigantresearch.com Phone: +45 97 32 52 99 / Fax: +45 97 32 55 93 2013 by Navigant Consulting, Inc For more information about Navigant, go to: www.navigant.com
7 BigData uusia palveluliiketoimintamahdollisuuksia - esimerkki: CAP Software Platform hanke ITEA/CAP - Konsortio - noin 30 yritystä ja tutkimuslaitosta - Turkki - Ranska - Espanja - Belgia - Etelä-Korea - Suomi Suomesta - VTT - Absent - Citynomadi - Flo Apps - Moventas - NetMan
8 Kansallinen ja kansainvälinen verkottunut t&k-toiminta Tutkimushankkeet parantamaan yritysten kilpailukykyä Osaamispohjan parantaminen koko arvoketjussa Uudet vientituotteet Kotimaiset tuulivoimatavoitteet ~2,5 GW/6 TWh/4 mrd vuoteen 2020 3,7 GW/9 TWh/6 mrd vuoteen 2025 kotimaisen työn osuuden varmistaminen Demonstraatiot tukemaan yritysten t&k-tarpeita Merituulivoimademonstraatio toteutunee erityistuella t&k-komponentti? Kylmien olosuhteiden testausasema syntyy tarpeeseen nyt paras Kanadassa tähän tähdännyt kotimainen EU-hanke kaatui uusi yritys? Metsäisen maaston tuulipuisto t&k-komponentti jonkin olemassa olevan hankkeen rinnalle? Horizon 2020 Vahva kansallinen t&k tulevaisuudessa edellytys EU-hankkeisiin pääsyyn? IEA-yhteistyö Osallistumismahdollisuuksia on paljon kotimaisia tutkimushankkeita tarvitaan rinnalle yritysten kanssa verkottuneet tutkimushankkeet sopiva toimintamalli?
9 VTT - 70 vuotta teknologiaa yhteiskunnan ja elinkeinoelämän hyväksi