1(7) CURRICULUM VITAE Name: Jouni Nurvo Year of birth: 1983 Nationality: Residence: Education Key Qualifications: Finnish Tampere 2002 Technical school Helsinki, Finland. (Electrician) 2006 Helsinki Institute of Technology, Finland, Electrical power engineering / B.S C Engineering Certified Erection Supervisor for NXAir, NXAir M, NXAirP, NXPlus, SIMOSEC and SIMOPRIME switchgear. Languages and Degree Of Proficiency: Speaking Writing Reading Finnish mother tongue English excellent good good Specialization in Firm: Commissioning and maintenance of HV and MV substations, control, protection and rtu systems (Sicam AK, Sicam 230) and also power plant electricity systems. Employment Record: 1.12.2015- Rificum Oy, Yrittäjä 1.4.2008-1.11.2015 Siemens Osakeyhtiö, Espoo Finland Energy Sector Power Transmission and Distribution / Commissioning engineer 13.7.2007-31.3.2008 Helsingin Energia Commissioning engineer 1.6.2006-31.12.2006 Helsingin Energia Design engineer 29.8.2005-31.5.2006 Helsingin Energia Research assistant 25.4.2005-28.8.2005 Helsingin Energia
2(7) Assistant design engineer 10.5.2004-30.9.2004 Helsingin Energia Assistant design engineer Illustrative Work Undertaken : 2008 Tornion Energia Oy, Luotomäki, 110/20 kv substation: Renewing of the 110kV AIS switchyard (4 bays) and the 20kV NXAIRM switchgear (28 bays), including protection and automation system. 2008 Pori Energia, Porin prosessivoima, 110/20 kv substation: 110kV AIS switchyard including protection system. 2009 Fingrid Oyj, Pikkarala 400/110/20 kv substation: Renewing of the control and protection systems for 400,110 and 20 kv. 2009 Turun Energia, Maaria, 110/10 kv substation: New 110kV AIS switchyard, 20kV NXPLUSC switchgear (11 bays), including protection and automation system. IEC61850 communication protocol is used. 2010 Fingrid Oyj, Multisilta, 110 kv substation: New 110kV GIS switchgear (6 bays) including protection and automation system. IEC61850 communication protocol is used. site, commissioning and customer training
3(7) 2010 Tampereen Sähköverkko Oy, Multisilta, 20 kv substation: New 20kV NXPLUSDBB switchgear (22 bays), 110/20kV transformer and earth fault compensation system, including protection and automation system. IEC61850 communication protocol is used. 2010 Several different substations. Periodical testing for protection relays of 6 20 kv switchgears. 2010 Rajakiiri, Puuska Wind power station. New 20kV NXPLUSC switchgear, including protection system. The task performed included: Supervision of implementation on 2011 Fingrid Oyj, LOKT Tolkkinen, Reserve Power Plant: Commissioning of 10 kv SIMOPRIME switchgear (4 bays). 2011 Lahti Energia Sähköverkot Oy, Laasonpohja, 20 kv substation: New 20kV SIMOSEC switchgear, including protection and automation system. 2011 Pori Energia Sähköverkot Oy, Läntinen, 20 kv substation: New 20kV NXPLUSC-DBB switchgear (10+10 bays), including protection and automation. 2011 Lahti Energia Oy, KYVO2, Power Plant: Main and block transformer protection, 110kV AIS switchyard, Generator circuit breaker switchgear NXAIRP and 3 pieces of 20kV NXAIRM switchgear (tot.27 bays)including protection, also including connections from the generator systems and the power plant existing systems.
4(7) 2012 Helsingin Energia Oy, Vuosaari A Power Plant: Generator and block transformer protection and synchronization. Connections to the 110kV switchgear totally 3 sets. 20kV switchgears protection renovation, totally 3 sets. Generator circuit breaker switchgear renovation 2 sets. IEC61850 communication protocol is used. site and commissioning of control and protection systems and documentation. 2012-2013 Hamina Energy Oy, Kirstakivi, 110 kv substation: New 110kV GIS switchgear (7 bays) including protection and automation system. IEC61850 communication protocol is used. site, commissioning, customer training and documentation. 2013 Fingrid Oyj, Kemiö 110 kv substation Renewing of 110 kv AIS substation (7 bays). Including protection and automation system. IEC61850 communication protocol is used. The tasks performed included: supervision of implementation, commissioning, customer training on site and documentation. 2013 Fingrid Oyj, Tainionkoski 110 kv substation Renewing control systems of 110 kv GIS switchgear with siprotec 5 relays and busbar (7SS) protection. IEC61850 communication protocol is used. The tasks performed included: supervision of implementation, commissioning, customer training on site and documentation. 2014 Caruna Oyj, Keilaniemi 110/20 kv substation New 20kV switchgear (23 bays), 110 kv (5 bays) and 2 transformers, including protection and automation systems. IEC61850 communication protocol is used. The task performed included: commissioning of protection relays, rtu and hmi. Also documentation.
5(7) 2015 Fingrid Oyj, Pirttikoski 400/220/20 kv substation Renewing 400 kv protection, control and automation systems. 400 kv will change to duplex type. One new transformer and 220 kv new bay for transformer. Also including protection, control and automation systems. The task performed included: Protection relay setups. commissioning control units (6MD58), rtu, hmi and documentation. 2015 Helen Sähköverkko Oy, Suvilahti 110/20 kv substation Adding one new bay for 110 kv GIS switchgear, relays changes including protection, control and automation. Adding one new bay for busbar protection. The task performed included: commissioning of protection and documentation. 2015 Fennovoima, Pyhäjoki Nuclear power plant 4 times 20 kv substation 8DJH switchgears (4x5 bays) with siprotec 5 relays, including protection and automation systems. Redundandecy 2xRTU and 2xScada. The task performed included: Commissioning rtu, scada documentation. 2015 Jyväskylä, Kangasvuori 110 kv substation New 110kV GIS switchgear (4 bays) including protection (SIP5) and automation system. IEC61850 communication protocol is used. The tasks performed included: Protection relay setup, fat testing and documentation.. 2016 Fingrid Oyj, Nokia Melo 110kV sähköaseman perusparannus Vastuualue: poääsuunnittelu, koestus/käyttöönotto 2016 Sandvik 2, Ruotsi Växjö, Generaattorin synkrointi ja magnetointi laitteiston uusiminen 2016 Fortum, Ruotsi Tukholma, VV1/VV2 katteloiden uusinta Vastuualue: pääsuunnitelu
6(7) 2016 Fingrid Oyj, Vajukosken Muuntajasuoja FAT testaus 2016 Fingrid Oyj, Petäjävesi 400/110/20kV sähköaseman perusparannus 2016 TSE, Naantali uusi 110kV muuntaja kenttä, 20kV kojeisto, 400V keskusksia 2017 Caruna Oy Lindsby 1kpl 110kV kentän uusinta 2017 Caruna Oy Lappohja 110/33 kv sähköaseman peruparannus (110kV 4 johtoa ja kiskokatkaisija) 2017 Caruna Oy Hanko 110/20 kv sähköaseman peruparannus (2 johtoa, 2 muuntajaa ja välierotinkenttä, 20kV: 3 kenttää) 2017 Caruna Oy Vikom 110/20kV sähköaseman peruparannus (20kV 17 kenttä, 110kV 2 johtoa, 2 muuntajaa ja välierotin kenttä) 2017 Caruna Gunnarsnäs 110/20kV uusi sähköasema (110kV: pääkisko+apukisko, 4 johto kenttää, kiskokatkaisija, reaktori kenttä, muuntaja kenttä 20kV: 14 kenttää) 2017 Fingrid Seitenoikea 220kV kentän uusinta, 110kV kentän lisäys, Muuntaja liitynnät testaus 2017 Fingrid Nuojua 20kV reaktorin lisäys, muuntajasuojan uusinta 2017 Fingrid Koria, 1kpl 110kV kondensaattori kentän uusinta 2017 Fingrid Alajärvi, 1kpl 110kV kentän uusinta
2018 Fingrid Koria, 7kpl 110kV kentän uusinta 7(7)