Model OVF 3-bander. 2 active elements on 20m 3 active elements on 17m. Version OH1TV 1

Samankaltaiset tiedostot
1. SIT. The handler and dog stop with the dog sitting at heel. When the dog is sitting, the handler cues the dog to heel forward.

LYTH-CONS CONSISTENCY TRANSMITTER

Efficiency change over time

Capacity Utilization

4x4cup Rastikuvien tulkinta

CONVERSION KITS FOR FRAMES MR8 AND MR9 INSTALLATION INSTRUCTIONS

The Viking Battle - Part Version: Finnish

On instrument costs in decentralized macroeconomic decision making (Helsingin Kauppakorkeakoulun julkaisuja ; D-31)

National Building Code of Finland, Part D1, Building Water Supply and Sewerage Systems, Regulations and guidelines 2007

Choose Finland-Helsinki Valitse Finland-Helsinki

Fitting instructions. Fitting set for joining all types of DEVI self limiting heating cables to heating cables Art. no SSTL nro

Information on preparing Presentation

SAGA 150. Asennusohjeet. Mittaa oven korkeus. Piirrä seinään oven kiinni -päätyyn seinäkannattimen kohdalle vaakaviiva korkeudelle ovi + 75mm + 20 mm.

Other approaches to restrict multipliers

On instrument costs in decentralized macroeconomic decision making (Helsingin Kauppakorkeakoulun julkaisuja ; D-31)

RULLARADAT RULLADAT ROLLER TABLES

The CCR Model and Production Correspondence

Huom. tämä kulma on yhtä suuri kuin ohjauskulman muutos. lasketaan ajoneuvon keskipisteen ympyräkaaren jänteen pituus

16. Allocation Models

Alternative DEA Models

KONEISTUSKOKOONPANON TEKEMINEN NX10-YMPÄRISTÖSSÄ

Counting quantities 1-3

Secto Design Oy Kauppalantie Kauniainen Finland tel fax info@sectodesign.fi

OMINAISUUDET SOVELLUS. Technical data sheet C2 - C4 - BULLDOG. Bulldogpuunsitojalevyt

make and make and make ThinkMath 2017

Gap-filling methods for CH 4 data

Uusi Ajatus Löytyy Luonnosta 4 (käsikirja) (Finnish Edition)

KMTK lentoestetyöpaja - Osa 2

FinFamily PostgreSQL installation ( ) FinFamily PostgreSQL

4x4cup Rastikuvien tulkinta. 4x4cup Control point picture guidelines

The role of 3dr sector in rural -community based- tourism - potentials, challenges

Lataa SETI Revisited - Risto Isomäki. Lataa

anna minun kertoa let me tell you

On instrument costs in decentralized macroeconomic decision making (Helsingin Kauppakorkeakoulun julkaisuja ; D-31)

Tarua vai totta: sähkön vähittäismarkkina ei toimi? Satu Viljainen Professori, sähkömarkkinat

Results on the new polydrug use questions in the Finnish TDI data

Kitchen Pendant 2/10/19

ASENNUSOHJE KAMMIOEROTIN JEKA MOOTTORIOHJAIMELLE N

7.4 Variability management

S Sähkön jakelu ja markkinat S Electricity Distribution and Markets

Siipiratasalus. Petri Sinivuori 92

Use of spatial data in the new production environment and in a data warehouse

Sisällysluettelo Table of contents

toukokuu 2011: Lukion kokeiden kehittämistyöryhmien suunnittelukokous

Särmäystyökalut kuvasto Press brake tools catalogue

TÄYTTÖAUTOMAATIT TÄYTTÖAUTOMAATIT COMPUTER INFLATORS

TM ETRS-TM35FIN-ETRS89 WTG

Counting quantities 1-3

Työmaadoitusvälineet suurjännitteelle

Network to Get Work. Tehtäviä opiskelijoille Assignments for students.

TEST REPORT Nro VTT-S Air tightness and strength tests for Furanflex exhaust air ducts

TM ETRS-TM35FIN-ETRS89 WTG

Secto 4200 pendant natural birch, black or white laminate, walnut veneer

Recirkulering. El-tilslutning. Kontrolpanel. Dansk. Timerfunktion

Integration of Finnish web services in WebLicht Presentation in Freudenstadt by Jussi Piitulainen

VAASAN YLIOPISTO Humanististen tieteiden kandidaatin tutkinto / Filosofian maisterin tutkinto

Returns to Scale II. S ysteemianalyysin. Laboratorio. Esitelmä 8 Timo Salminen. Teknillinen korkeakoulu

indexhan wen Club Ambulant -play together

MIKES, Julkaisu J3/2000 MASS COMPARISON M3. Comparison of 1 kg and 10 kg weights between MIKES and three FINAS accredited calibration laboratories

TM ETRS-TM35FIN-ETRS89 WTG

BRUTTO PINTA- ALA (M 2 ) KEHYKSEN MATERIAAL I. EA-HP-1500/47-18 Super heat ALUMIINI 1, , *1680*110 59

Kuivajääpuhallus IB 15/120. Vakiovarusteet: Suutinlaatikko Suutinrasva Viuhkasuutin Viuhkasuuttimen irto-osa 8 mm Työkalu suuttimenvaihtoon 2 kpl

MALE ADULT FIBROBLAST LINE (82-6hTERT)

FIS IMATRAN KYLPYLÄHIIHDOT Team captains meeting

Tynnyrivaara, OX2 Tuulivoimahanke. ( Layout 9 x N131 x HH145. Rakennukset Asuinrakennus Lomarakennus 9 x N131 x HH145 Varjostus 1 h/a 8 h/a 20 h/a

Tilausvahvistus. Anttolan Urheilijat HENNA-RIIKKA HAIKONEN KUMMANNIEMENTIE 5 B RAHULA. Anttolan Urheilijat

1. Liikkuvat määreet

MEETING PEOPLE COMMUNICATIVE QUESTIONS

Yhtiön nimi: - Luotu: - Puhelin: - Fax: - Päiväys: -

Arkkitehtuuritietoisku. eli mitä aina olet halunnut tietää arkkitehtuureista, muttet ole uskaltanut kysyä

TM ETRS-TM35FIN-ETRS89 WTG

TM ETRS-TM35FIN-ETRS89 WTG

Metsälamminkankaan tuulivoimapuiston osayleiskaava

No Problem TARJOTTIMET

B 95 RS Bp Pack. 1 Integroitu lakaisuyksikkö. B 95 RS Bp Pack, ,

TIETEEN PÄIVÄT OULUSSA

( ( OX2 Perkkiö. Rakennuskanta. Varjostus. 9 x N131 x HH145

TM ETRS-TM35FIN-ETRS89 WTG

Infrastruktuurin asemoituminen kansalliseen ja kansainväliseen kenttään Outi Ala-Honkola Tiedeasiantuntija

FETAL FIBROBLASTS, PASSAGE 10

Salasanan vaihto uuteen / How to change password

ELEMET- MOCASTRO. Effect of grain size on A 3 temperatures in C-Mn and low alloyed steels - Gleeble tests and predictions. Period

You can check above like this: Start->Control Panel->Programs->find if Microsoft Lync or Microsoft Lync Attendeed is listed

OMINAISUUDET SOVELLUS. Technical data sheet BOAX-II HDG - KIILA-ANKKURI. Mutterin ja aluslevyn kanssa. UK-DoP-e08/0276, ETA-08/0276.

FI GB. Asennus-, käyttöohjeet. Installation, operation instructions

TM ETRS-TM35FIN-ETRS89 WTG

1.3 Lohkorakenne muodostetaan käyttämällä a) puolipistettä b) aaltosulkeita c) BEGIN ja END lausekkeita d) sisennystä

S SÄHKÖTEKNIIKKA JA ELEKTRONIIKKA

TM ETRS-TM35FIN-ETRS89 WTG

03 PYÖRIEN SIIRTÄMINEN

Mat Seminar on Optimization. Data Envelopment Analysis. Economies of Scope S ysteemianalyysin. Laboratorio. Teknillinen korkeakoulu

PRODUCT CATALOGUE - TUOTEKUVASTO METAL WIRE - METALLILANKA

Hanna Lehtonen Kello kolme yöllä

Secto Design Oy Kauppalantie Kauniainen Finland tel fax

ASUNTOSUUNNITTELU TÄNÄÄN

Käyttöliittymät II. Käyttöliittymät I Kertaus peruskurssilta. Keskeisin kälikurssilla opittu asia?

INSTALLATION INSTRUCTION ASENNUSOHJE PEM SJTK31 SJTK46 ENGLISH SUOMI

O-renkaan vaihto-ohje Instructions for replacement of o-ring

1. Telien sijoittelu raiteille ja tuenta 1. Bogie placement and supporting on the tracks

Installation instruction PEM

Transkriptio:

Model 323-201517 OVF 3-bander 2 active elements on 20m 3 active elements on 15m 3 active elements on 17m Version 1.0 26.7.2017 OH1TV 1

Preface This is a collection of documents for our own use, generated during an antenna building project. Participants in the project were Lasse OH1EVI, Elias OH1XFE and Pekka OH1TV. Everybody built his own antenna but also gave ideas and support to each other. We would like to present this as an example of a successful joint project rather than a construction guide. The documentation is not complete. But an experienced builder can solve the missing details... The antenna itself is not conventional. There are many ideas not often seen together, like Two driven elements, Opposite Voltage Feed on all bands Open sleeve feed on 15 and 17m to two elements Band switching partly by relays, 15/17m Band combination 20m 17m and 15m Integral impedance matching unit 26.7.2017 OH1TV 2

26.7.2017 OH1TV 3

OVF 3-bander, Model 323 Bands 20, 15 and 17m 2 active elements on 20m, G=6.5dBi 3 active elements on 15m, G=8.0dBi 3 active elements on 17m, G=7.4dBi F/B 20dB on all bands SWR<1.5 on all bands Boom length 520cm max spacing 500cm 2 fed elements, the 20m elements 3 parasitic elements on 15m On 17m the 15m elements are coil loaded to 17m. Switched L-match for each band Instant band change Monoband performance 26.7.2017 OH1TV 4

20m, free space 26.7.2017 OH1TV 5

20m, measured at L-box input, height 16m 26.7.2017 OH1TV 6

15m, free space 26.7.2017 OH1TV 7

15m, measured at L-box input, height 16m 26.7.2017 OH1TV 8

17m, free space 26.7.2017 OH1TV 9

17m, measured at L-box input, height 16m 26.7.2017 OH1TV 10

Band switch 15m/17m with relay Relay POM With 2 kw input max voltage over inductor on on 17m is 750V @ 11.5A. Russian relay B1B (V1V) is 3kV 10A Relay + wiring inductance is 60nH @ 15m Relay Boom 26.7.2017 OH1TV 11

26.7.2017 OH1TV 12

Relay wiring L J Radiation 15m element 20m element J L Junction box L-match 26.7.2017 OH1TV 13

26.7.2017 OH1TV 14

L-match installation A T-connector A - A Boom L-match A Antenna direction 26.7.2017 OH1TV 15

Element detail 26.7.2017 OH1TV 16

Dimensions 26.7.2017 OH1TV 17

Tapering plan for 20m elements Dimensions for one side only, mm Dia net length cut length cumulative pcs 30 7.5 center isolator 7.5 2 30 992.5 992.5 1000 4 25 1000 1100 2000 4 19 1000 1100 3000 4 15 1000 1100 4000 4 12 1308 1450 5308 rear 2 12 788 900 4788 front 2 In tuning phase 13mm was added to the four 20m-element tips, which is included in the values above. Taper 3d 26.7.2017 OH1TV 18

Tapering plan for 15m elements Dimensions for one side only, mm Dia net length cut length cumulative pcs 25 10 center isolator 10 3 25 490 490 500 6 19 1000 1060 1500 6 15 1000 1100 2500 6 12 1124 1250 3624 rear 2 12 937 1050 3447 middle 2 12 713 850 3213 front 2 In tuning phase 36mm was added to the six 15m-element tips, which is included in the values above. Taper 3d 26.7.2017 OH1TV 19

Element spacing Position Element 0 mm 20m rear 350 mm 15m rear 2650 mm 15m middle 3000 mm 20m front 5000 mm 15m front 1500 mm T-connection, L-match Abt 2000 Mast 26.7.2017 OH1TV 20

Boom, made of 3 parts, or just one 3000 450 1750 100 1400 100 40x40x2 x1500 150 250 Box 45x45x2 x2000 150 40x40x2 x2000 1350 2000 1850 5200 OH1XFE and OH1EVI made the boom in one piece, 5200 long 45x45x2 alu tube. 26.7.2017 OH1TV 21

Tuning the elements In the Eznec model the antenna was set to height corresponding the tuning height (16m). Impedance pattern at the T-connector was recorded, on each band. The instrument was AIM 4170B, calibrated to show impedance at the T-connector. First tuning was the 20m band. Impedance pattern offset was corrected by adjusting both 20m elements, same amount. Next 15m was tuned using the same idea, removing the offset, same change to all three elements. Last tuning was 17m. Only the coil values can tune 17m. No change was needed. Coils were accurate! All 3 built antennas were a bit different, even same dimensions were used. Individual tuning therefore was a good idea. Trusting on mechanical dimensions would have been a mistake. 26.7.2017 OH1TV 22

L-box Antenna tuner at the feedpoint, L-match 26.7.2017 OH1TV 23

26.7.2017 OH1TV 24

2mm 10mm 5mm First prototype by OH1TV 20m 17m 5mm 15m To radio Antenna T-connector Box 120x120x59 Hammond 1590U = suggested movement 26.7.2017 OH1TV 25

Second L-box by OH1XFE 20m 17m 15m To radio Antenna T-connector Box 120x120x59 Hammond 1590U 26.7.2017 OH1TV 26

Third L-box by OH1EVI 20m 17m 15m To radio Antenna T-connector 26.7.2017 OH1TV 27

Aligning the L-box Make the tuning in the lab, the box removed from the antenna Use antenna analyzer, AIM 4170B or similar quality. Calibrate the instrument at the end of connecting cable, max 1m long. Connect the cable to the antenna input ( where the T-connector comes to) Terminate the TX-connector with good quality 50 ohm calibration pad. Target values on point frequencies are: 21275kHz: 39.49 + j 16.18 ohm 14175kHz: 12.12 - j 0.74 ohm 18125kHz: 45.72 - j 9.37 ohm The frequencies are the points where minimum SWR of the full antenna should appear The target impedances are conjugate values of the antenna itself, seen from the T- connector Trim with component values 26.7.2017 OH1TV 28

Parts 20m: 2 elements OVF 15m: 3 parasitic elements, 2 of them open sleeve to 20m elements 17m: 15m elements with inductive loading at the element center 26.7.2017 OH1TV 29

20m element (dia 30mm) mounting bracket 2 pcs needed 20 20 13 D 6 D 8 D 6 22 80 67 40 8 D 6 D 8 D 6 18 180 Material: Aluminum 80x30x5 x180, L-profile Screws for Stauffs 4pcs M6x60 Bracket to boom 2pcs M8x 70 26.7.2017 OH1TV 30

15m element (dia 25mm) mounting bracket, new 3 pcs needed 16 16 15 D 6 D 8 D 6 27 33 60 D 6 D 6 120 D 18 12 deep 15 D 8 D 5 45 46 160 55 Material: POM 16 x160x120 black Screws for Stauffs 4pcs M6x70 Bracket to boom 2pcs M8x 70 26.7.2017 OH1TV 31

Boom to mast bracket 20 20 20 D 8 D 8 D 8 D 8 250 D 8 D 8 54 152 D 8 D 8 98 20 250 Material: Aluminum plate 6x250x250 26.7.2017 OH1TV 32

Element center isolator for 30mmm tube 2 pcs needed 40 26.8 30 15 Material dia 30mm POM 95 Ohennus tehdään sorvissa. 10x0.04 siivuina. 48-50 x 0.04 antaa oikean lopputuloksen. Tarkistetaan tulkilla, joka on 30mm putki. 26.7.2017 OH1TV 33

Element center isolator for 25mmm tube 3 pcs needed 40 21.9 25 20 Material dia 25mm POM 100 Ohennus tehdään sorvissa. 10x0.04 siivuina. 48-50 x 0.04 antaa oikean lopputuloksen. Tarkistetaan tulkilla, joka on 25mm putki. 26.7.2017 OH1TV 34

Coils for 17m, taper 3d 3 different needed L 5 5 16.4 Dia 2 hole Inductance values needed Rear 1.12uH Middle 1,19uH Front 1.42uH 1.5mm emaled cu wire on dia 16.4mm POM form 1.12uH = 11 turns, 28mm long, L=38mm POM 1.19uH = 12 turns, 30mm long, L=40mm POM 1.42uH = 13 turns, 33mm long, L=43mm POM Q = abt 400 26.7.2017 OH1TV 35

17m coil 26.7.2017 OH1TV 36

Relay foot 3 pcs needed 10 30 13 4 Material dia 30mm POM Ohennus tehdään sorvissa. 20x0.04 siivuina. -260 x 0.04 antaa oikean lopputuloksen. 26.7.2017 OH1TV 37

Cable to relay 6 pcs needed Cable lug Hole dia 4mm 44 Shield of RG58 is used as cable here. It is thick and flexible Cable lugs are just crimped, no soldering needed Align lugs in 90 degree angle on the cable Cable shall be covered with self vulcanizing tape > Relay loop total inductance is 60nH 26.7.2017 OH1TV 38

Fitting between dia 25 and 19mm tubes 10 pcs needed 60 Material dia 22mm aluminum tube, 1.5mm thick. Katkaise 90mm pala putkea Ohenna sorvissa 65mm matkalta mittaan 21.5mm. Ota kaksi 5x0.04 paksua kerrosta, yhteensä 10x0.04. Halkaise aksiaalisesti yhdeltä syrjältä kulmahiomakoneella. Sahaa irti ja huolittele viilalla. Työnnä 19mm putken päälle 26.7.2017 OH1TV 39

Fitting between dia 19 and 15mm tubes 10 pcs needed 75 Material aluminum plate, 0.25mm thick. Cut 75x45mm piece. Roll around dia 15mm tube. 26.7.2017 OH1TV 40

Fitting between dia 15 and 12mm tubes 10 pcs needed 75 Material aluminum plate, 0.25mm thick. Cut 75x36mm piece. Roll around dia 12mm tube. 26.7.2017 OH1TV 41

Feed cables for 20m elements, 2pcs UHF Cable RG11U 75ohm 35 35 Heat shrink tube 5 ferrite beads FB-43-1020 1490 35 27 Cable lug Hole dia 4mm Protect cable end with self vulcanizing tape 26.7.2017 OH1TV 42

15m elementtien suojakopan työstö Hieno koppa tulee Eliakselta OH1XFE. Siihen pitää työstää kolot elementeille ja reiät elementin pohjalevyyn kiinnittämistä varten Piirrä päätyihin tussilla merkit kuvaamaan elementin keskilinjaa Jos koppa mahtuu kiinni releen ollessa paikallaan + 5mm toleranssia, on elementin keskilinja 33.5mm kopan alareunasta, merkitse. Koppa menee tällöin pohjalevyn alareunaan Piirrä ympyrät mitta-sormuksella em. keskipisteenä, sormuksen sisä- ja ulkopuolelle Piirrä viivat kohtisuoraan kopan alareunasta niin, että ne leikkaavat em. ympyrät, siis neljä viivaa Poraa 6mm puuporalla reikiä niin, että ne sivuavat em. sisäympyrää Leikkaa rälläkällä 1mm leikkauslaikalla em. suorat sisimmäiset viivat Viimeistele Dremelin hiomarullalla pitkin ulommaista viivaa KOLO VALMIS Kiinnitysreiät sijaitsevat +/-50mm puomin keskilinjasta ja 6mm kopan reunasta. Reiät 5mm puuporalla Pohjalevyyn tehdään vastaavat reiät, ensin 3.5mm poralla 25mm syvä ja sitten 4mm kierre 30mm päästä, 8.3mm reunasta (keskelle). Näin reikien väli sivulla on 100mm 26.7.2017 OH1TV 43

Installation for the first measurements 26.7.2017 OH1TV 44