- 5 vuotta sitten
- Katselukertoja:
Transkriptio
1 Working Report Studies of Quaternary Deposits in Investigation Trenches OL-TK15 and OL-TK16 on the Olkiluoto Study Site, Eurajoki, SW Finland Pekka Huhta May 2009 POSIVA OY Olkiluoto FI EURAJOKI, FINLAND Tel Fax
2 Working Report Studies of Quaternary Deposits in Investigation Trenches OL-TK15 and OL-TK16 on the Olkiluoto Study Site, Eurajoki, SW Finland Pekka Huhta Geological Survey of Finland May 2009 Base maps: National Land Survey, permission 41/MML/09 Working Reports contain information on work in progress or pending completion. The conclusions and viewpoints presented in the report are those of author(s) and do not necessarily coincide with those of Posiva.
3 ABSTRACT The Quaternary deposits in investigation trenches OL-TK15 and OL-TK16 were studied by the Geological Survey of Finland in summer Samples for grain size determinations were taken from vertical profiles, placed 25 m apart along the trench. Each till bed was sampled separately. The profiles extended from the soil surface down to bedrock. The samples were first dried in the laboratory after which they were sieved. In addition, the grain size distribution of the < 63 µm fraction was analyzed with the Sedigraph 5100 instrument. Sedimentological observations of the sampling profiles were documented in field by drawing them on a field observation form and the profiles were photographed using a digital camera. In addition, the excavated section was photographed along its whole length. The till cover in OL-TK15 and OL-TK16 consists of two parts. The surface layer of the upper till is oxidized, brown till, whereas the lower layer is unoxidized, grey till. The lower till has been preserved in bedrock depressions. The lower till is compact, dark grey silty till with more than 20% of clay-size material (under mm). The upper till in OL-TK15 and OL-TK16 was deposited in the last flow phase of the Weichselian continental ice. Bedrock striations indicate that the ice moved in a WNW- ESE direction. The till beds level out the bedrock topography. Weathered bedrock till, and also weathered bedrock, was found in places at the bottom of both trenches. The dark grey silty till in profile OL-TK16-07 is vertically cracked. The cracks are filled with sand. This cracking and sand filling has possibly been caused by ice pressure when ice deposited the upper till. No broken bedrock was found under the cracked till as in trench OL-TK14. No signs of postglacial faults were detected either in the tills or in the exposed bedrock. The tills showed no signs of disturbance related to bedrock movements, only icepressed cracks were found in the lower silty compact till. Keywords: overburden, glacial geology, till, stratigraphy, trench, grain size, Quaternary, Finland; Province of Western Finland; Satakunta; Eurajoki; Olkiluoto
4 Maaperätutkimukset tutkimuskaivannoissa OL-TK15 ja OL-TK16 Olkiluodon alueella Eurajoella Lounais-Suomessa TIIVISTELMÄ Olkiluodon tutkimuskaivannot OL-TK15 ja OL-TK16 tutkittiin kesällä Kaivannoista otettiin lapiolla raesuuruusnäytteet 25 metrin välein vertikaalisesti läpi koko moreenipeitteen kallioon asti. Näytteet otettiin jokaisesta moreeniyksiköstä erikseen. Laboratoriossa näytteet kuivattiin, jonka jälkeen ne seulottiin. Seulottu alle 63 mikronin osanäyte analysoitiin Sedigraph 5100-laitteella. Jokainen näytteenottoprofiili kuvattiin piirtämällä lomakkeelle ja digitaalikameralla. Lisäksi tutkimuskaivannot kuvattiin kameralla päästä päähän. Tutkimuskaivannoista OL-TK15 ja OL-TK16 löydettiin kahden eri jäätiköitymisvaiheen moreenipatjat. Ylempi moreeni koostuu kahdesta kerroksesta. Pintaosassa on hapettunut, ruskea hiekka/silttimoreeni. Alempi kerros on hapettumaton, harmaa hiekka/silttimoreeni. Alempi moreenipatja on säilynyt kallion painanteissa. Alempi moreeni on tiivistä, tummanharmaata silttimoreenia, jossa savespitoisuus (<0.002 mm:n ainesta) on yli 20%. Ylemmän moreenin kerrostanut jäätikkö on uurresuuntien perusteella virrannut länsiluoteesta itäkaakkoon. Maastossa moreenipeite tasoittaa kalliopinnan epätasaisuudet. Rapakalliomoreenia löytyi molempien tutkimuskaivantojen pohjalta. Rapakalliota löytyi myös paikoin. Profiilissa OL-TK16-07 oleva silttimoreeni on pystysuoraan rakoutunut. Raot ovat täyttyneet hiekalla. Tämä rakoilu lienee tapahtunut jäätikön paineen voimasta ylemmän moreenin kerrostumisen aikana. Rakoilleen moreenin alta ei löytynyt rikkoutunutta kalliota kuten kaivannossa OL-TK14. Mitään merkkejä postglasiaalisista siirroksista ei moreenipeitteestä tai paljastetusta kallion pinnasta löydetty, eikä moreenissa havaittu kallioperän liikuntoihin viittaavia häiriörakenteita, vain jäätikön paineen tekemiä rakoja alemmassa silttimoreenissa. Avainsanat: maapeite, glasiaaligeologia, moreeni, stratigrafia, kaivannot, raekoko, kvartääri, Suomi; Länsi-Suomen lääni; Satakunta; Eurajoki; Olkiluoto
5 1 TABLE OF CONTENTS ABSTRACT TIIVISTELMÄ 1 INTRODUCTION SAMPLING AND GRAIN SIZE DETERMINATIONS RESULTS OF INVESTIGATION SUMMARY REFERENCES APPENDICES... 17
6 2
7 3 1 INTRODUCTION The Quaternary deposits in investigation trenches OL-TK15 and OL-TK16 were studied by the Geological Survey of Finland in summer The investigations were carried out in two phases as the excavation progressed. Samples for grain size determinations were taken from vertical profiles, placed 25 m apart along the trench. Sedimentological observations of the sampling profiles were documented in field by drawing them on a field observation form and the profiles were photographed using a digital camera. In addition, the excavated section was photographed along the whole length. Sampling profiles are numbered OL-TK and OL-TK The coordinates of the sampling profiles are shown in Appendix 1 and the locations in Appendices 2 and 3. The location of each sampling profile was determined with the help of start and end points of sections pre-determined for bedrock mapping. The observation forms and the grain size analyses of each profile are presented in the Appendices of this report. An observation form is designed to standardize the recording of field data. Till properties (compactness, stone content, stone size, roundness of clasts) are classified on a five degree scale, on which 1 refers to the lowest and 5 to the highest degree of the property ( Hirvas 1991).
8 4
9 5 2 SAMPLING AND GRAIN SIZE DETERMINATIONS Samples for grain size determinations were taken from vertical profiles extending from the soil surface down to bedrock. An amount of 3 to 4 kg of sediment was taken with a shovel and placed in plastic bags for transport to the laboratory. The samples were first dried in the laboratory. Grains over 6 mm were extracted before analysis. The samples were first sieved and then the grain size distribution of the < 63 µm fraction was analyzed with the Sedigraph 5100 instrument. Table 1 shows the soil sampling depths and the soil type classification in OL- TK 15 and OL-TK16. Table 1. Soil sampling depths and soil type classification in OL-TK 15 and OL-TK16. Profile depth in Soil type classification metres d50 (GEO) geotechnical classification (RT) OL-TK silty till silty till OL-TK sandy till fine sandy till OL-TK silty till fine sandy till OL-TK silty till fine sandy till OL-TK sandy till fine sandy till OL-TK silty till fine sandy till OL-TK silty till fine sandy till OL-TK silty till fine sandy till OL-TK sandy till fine sandy till OL-TK sandy till fine sandy till OL-TK sandy till fine sandy till OL-TK sandy till fine sandy till OL-TK silty till fine sandy till OL-TK silty till fine sandy till OL-TK silty till fine sandy till OL-TK sandy till fine sandy till OL-TK silty till fine sandy till OL-TK silty till fine sandy till OL-TK silty till fine sandy till OL-TK silty till fine sandy till/silty till OL-TK silty till fine sandy till OL-TK silty till fine sandy till Soil type classification after Aaltonen et al (RT) and Korhonen et al (GEO).
10 6
11 7 3 RESULTS OF INVESTIGATION A total of 5 profiles from north to south were sampled from OL-TK15, which is approximately 90 m long. The height of the profiles varied between 4.0 m and 1.8 m with an average of 3.0 m. A summary of the sampling profiles is presented in Fig. 1. The Figure shows how the till cover very effectively levels out the bedrock topography. Figure 1. Summary of sampling profiles OL-TK The till cover in OL-TK15 consists of two parts. The upper till has two layers. The surface layer is oxidized, brown sandy/silty till. The lower layer is unoxidized, grey sandy/silty till. The thickness of the upper till ranges from 1.0 to 4.0 meters. The upper till in OL-TK15 is classified as having a less than normal amount of cobbles and boulders, with the size of the larger clasts ranging from 6 to 20 cm. The edges of the clasts are eroded and rounded. The upper till displays normal compactness (Fig. 2). The lower till has been preserved in bedrock depressions. The lower till is compact, dark grey silty till with over 17 % of fine material (under mm). The lower till is classified as having a less than normal amount of cobbles and boulders, with the size of the larger clasts ranging from 6 to 20 cm. The edges of the clasts are eroded and rounded.
12 8 Figure 2. Upper till in OL-TK A total of 8 profiles from west to east were sampled from OL-TK16, which is approximately 170 m long. The height of the profiles varied between 3.4 m and 1.2 m with an average of 2.2 m. A summary of the sampling profiles is presented in Fig. 3.
13 9 Figure 3. Summary of sampling profiles OL-TK The till cover in OL-TK16 also consists of two parts. In places the upper till has two layers. The surface layer is oxidized, brown sandy/silty till. The lower layer is unoxidized, grey sandy/silty till. The thickness of the upper till ranges from 0.8 to 4.0 metres. The upper till in OL-TK16 is classified as having a less than normal amount of cobbles and boulders, with the size of the larger clasts ranging from 6 to 20 cm. The edges of the clasts are eroded and rounded. The upper till displays normal compactness (Fig. 4).
14 10 Figure 4. Dark grey till and a channel filled with sand/clay in OL-TK At profile OL-TK16-06 the upper till has been washed away to lower till forming some kind of a channel in it. This channel is filled with clay and sand. Sand was also found on the surface of the upper till. The lower till has been preserved in bedrock depressions. The lower till is compact, dark grey silty till with over 22 % of clay-size material (under mm). The lower till is classified as having a less than normal amount of cobbles and boulders, with the size of the larger clasts ranging from 6 to 20 cm. The edges of the clasts are eroded and rounded. The dark grey silty till in profile OL-TK16-07 is vertically cracked. The cracks are filled with sand. This cracking and sand filling has possibly been caused by ice pressure when ice deposited the upper till. No broken bedrock was found under the cracked till as in trench OL-TK14 (Huhta 2008).
15 11 Figure 5. Sand filled cracks in dark grey till in OL-TK The tool is 24 cm long. The lowest part of the till material has in both trenches been mixed with weathered bedrock material at some points, forming a layer of weathered bedrock till. This silty/sandy reddish brown till contains plenty of clay size material from the weathered bedrock (over 23 %). The thickness of this till is 0.2 to 0.8 metres. Weathered bedrock was found at some points at the bottom of both trenches. The upper till bed was deposited in the last flow phase of the Weichselian continental ice about BP. The lower till bed has been deposited in an earlier flow phase of the Weichselian. This dark grey silty till can be found widely in southwestern Finland and the estimated age of the till bed is about BP. The till contains pollen and diatom from the sea sediments (clays) formed during the Eemian interglacial period ( BP). Bedrock striations at the trench indicate that the ice moved in a WNW-ESE direction when the upper till bed was deposited. It has been measured earlier e.g. in OL-TK13 that during the deposition of the lower till bed the ice moved from North. No signs of postglacial faults were detected either in the tills or in the exposed bedrock. The tills showed no signs of disturbance related to bedrock movements, only icepressed cracks were found in the lower silty compact till.
16 12
17 13 4 SUMMARY Two till beds were found in trenches OL-TK15 and TK16 in Olkiluoto. The upper till bed has two layers. The surface layer is oxidized, brown sandy/silty till, whereas the lower layer is unoxidized, grey sandy/silty till. These tills have an average clay-size fraction of 8 %. The lower till bed has been preserved in bedrock depressions. It is compact, dark grey silty till with 23 % of clay-size material on average. The upper till bed was deposited in the last flow phase of the Weichselian continental ice. Bedrock striations indicate that the ice moved in a WNW-ESE direction. The lower till bed has been deposited in an earlier flow phase of the Weichselian. The lowest part of till material has in both trenches mixed with weathered bedrock material at some points, forming a layer of weathered bedrock till. This silty/sandy reddish brown till contains plenty of clay size material (27 % on average) from the weathered bedrock. Weathered bedrock was found at some points at the bottom of both trenches. The dark grey silty till in profile OL-TK16-07 is vertically cracked. The cracks are filled with sand. This cracking and sand filling has possibly been caused by ice pressure when ice deposited the upper till. No broken bedrock was found under the cracked till as in trench OL-TK14. No signs of postglacial faults were detected either in the tills or in the exposed bedrock. The tills showed no signs of disturbance related to bedrock movements, only ice pressed cracks were found in the lower silty compact till.
18 14
19 15 REFERENCES Aaltonen, V.T., Aarnio, B., Hyyppä, E., Kaitera, P., Keso, L., Kivinen, E., Kokkonen, P., Kotilainen, M.J., Sauramo, M., Tuovila, P. & Vuorinen, J., Maaperäsanaston ja maalajien luokituksen tarkastus v Summary: A critical review of soil terminology and soil classification in Finland in the year Maataloustieteellinen Aikakauskirja: 21, Hirvas, H., Pleistocene stratigraphy of Finnish Lapland. Geological Survey of Finland, Bulletin p., 75 figs., 9 tables and 2 appendices. Huhta, Studies of Quaternary Deposits of Investigation Trench OL-TK14 at the Olkiluoto Study Site, Eurajoki, SW Finland. Working Report Posiva. Korhonen, K.-H., Gardemeister, R. & Tammirinne, M., Geotekninen maalajiluokitus. Geotekniikan laboratorio, tiedonanto 14, 20 s. 2 liitettä.
20 16
21 17 APPENDICES Appendix 1. Coordinates of the soil sampling profiles in trenches OL-TK15 and OL-TK16. Appendix 2. Location of investigation trenches OL-TK15 and TK16. Appendix 3. Location of sampling profiles OL-TK15/01 05 and TK16/ Appendix Field observation forms OL-TK15/01 05 and TK16/ Appendix Grain size analyses from trenches OL- TK15 and TK16.
22 18
23 19 Appendix 1. Coordinates (KKJ) of the soil sampling profiles in trenches OL-TK15 and TK16. Profile x y z OL-TK OL-TK OL-TK OL-TK OL-TK OL-TK OL-TK OL-TK OL-TK OL-TK OL-TK OL-TK OL-TK Notes for field observation forms: GS = sample for grain size analysis CO = compactness ST = stone content SSZ = stone size RO = roundness of clasts WB = weathered bedrock WBtill = till material mixed with WB Used grain diameters in mm: grain diameter mm geotechnical (geo) construction technical (rt) classification 20-2 gravel gravel sand sand sand sand sand fine sand silt fine sand silt silt silt silt under clay clay
24 20 Appendix 2. Location of investigation trenches OL-TK14, OL-TK15 and OL-TK16.
25 21 Appendix 3. Location of sampling profiles OL-TK and TK
26 22 Appendix 4
27 23 Appendix 5
28 24 Appendix 6
29 25 Appendix 7
30 26 Appendix 8
31 27 Appendix 9
32 28 Appendix 10
33 29 Appendix 11
34 30 Appendix 12
35 31 Appendix 13
36 32 Appendix 14
37 33 Appendix 15
38 34 Appendix 16
39 35 Appendix 17
40 36 Appendix 18
41 37 Appendix 19
42 38 Appendix 20
43 39 Appendix 21
44 40 Appendix 22
45 41 Appendix 23
46 42 Appendix 24
47 43 Appendix 25
48 44 Appendix 26
49 45 Appendix 27
50 46 Appendix 28
51 47 Appendix 29
52 48 Appendix 30
53 49 Appendix 31
54 50 Appendix 32
55 51 Appendix 33
56 52 Appendix 34
57 53 Appendix 35
58 54 Appendix 36
59 55 Appendix 37
60 56 Appendix 38
Studies of Quaternary Deposits of Investigation Trench OL-TK14 at the Olkiluoto Study Site, Eurajoki, SW Finland
Working Report 2008-31 Studies of Quaternary Deposits of Investigation Trench OL-TK14 at the Olkiluoto Study Site, Eurajoki, SW Finland Pekka Huhta Geological Survey of Finland May 2008 Base maps: National
LisätiedotStudies of Quaternary Deposits of Investigation Trench OL-TK13 at the Olkiluoto Study Site, Eurajoki, SW Finland
Working Report 2007-34 Studies of Quaternary Deposits of Investigation Trench OL-TK13 at the Olkiluoto Study Site, Eurajoki, SW Finland Pekka Huhta May 2007 POSIVA OY FI-27160 OLKILUOTO, FINLAND Tel +358-2-8372
Lisätiedot1. SIT. The handler and dog stop with the dog sitting at heel. When the dog is sitting, the handler cues the dog to heel forward.
START START SIT 1. SIT. The handler and dog stop with the dog sitting at heel. When the dog is sitting, the handler cues the dog to heel forward. This is a static exercise. SIT STAND 2. SIT STAND. The
LisätiedotWindPRO version joulu 2012 Printed/Page :42 / 1. SHADOW - Main Result
SHADOW - Main Result Assumptions for shadow calculations Maximum distance for influence Calculate only when more than 20 % of sun is covered by the blade Please look in WTG table 13.6.2013 19:42 / 1 Minimum
LisätiedotWindPRO version joulu 2012 Printed/Page :47 / 1. SHADOW - Main Result
SHADOW - Main Result Assumptions for shadow calculations Maximum distance for influence Calculate only when more than 20 % of sun is covered by the blade Please look in WTG table WindPRO version 2.8.579
LisätiedotMetsälamminkankaan tuulivoimapuiston osayleiskaava
VAALAN KUNTA TUULISAIMAA OY Metsälamminkankaan tuulivoimapuiston osayleiskaava Liite 3. Varjostusmallinnus FCG SUUNNITTELU JA TEKNIIKKA OY 12.5.2015 P25370 SHADOW - Main Result Assumptions for shadow calculations
Lisätiedot,0 Yes ,0 120, ,8
SHADOW - Main Result Calculation: Alue 2 ( x 9 x HH120) TuuliSaimaa kaavaluonnos Assumptions for shadow calculations Maximum distance for influence Calculate only when more than 20 % of sun is covered
Lisätiedot( ( OX2 Perkkiö. Rakennuskanta. Varjostus. 9 x N131 x HH145
OX2 9 x N131 x HH145 Rakennuskanta Asuinrakennus Lomarakennus Liike- tai julkinen rakennus Teollinen rakennus Kirkko tai kirkollinen rak. Muu rakennus Allas Varjostus 1 h/a 8 h/a 20 h/a 0 0,5 1 1,5 2 km
Lisätiedot( ,5 1 1,5 2 km
Tuulivoimala Rakennukset Asuinrakennus Liikerak. tai Julkinen rak. Lomarakennus Teollinen rakennus Kirkollinen rakennus Varjostus "real case" h/a 1 h/a 8 h/a 20 h/a 4 5 3 1 2 6 7 8 9 10 0 0,5 1 1,5 2 km
LisätiedotTynnyrivaara, OX2 Tuulivoimahanke. ( Layout 9 x N131 x HH145. Rakennukset Asuinrakennus Lomarakennus 9 x N131 x HH145 Varjostus 1 h/a 8 h/a 20 h/a
, Tuulivoimahanke Layout 9 x N131 x HH145 Rakennukset Asuinrakennus Lomarakennus 9 x N131 x HH145 Varjostus 1 h/a 8 h/a 20 h/a 0 0,5 1 1,5 km 2 SHADOW - Main Result Assumptions for shadow calculations
LisätiedotTM ETRS-TM35FIN-ETRS89 WTG
SHADOW - Main Result Assumptions for shadow calculations Maximum distance for influence Calculate only when more than 20 % of sun is covered by the blade Please look in WTG table 22.12.2014 11:33 / 1 Minimum
LisätiedotTM ETRS-TM35FIN-ETRS89 WTG
SHADOW - Main Result Calculation: N117 x 9 x HH141 Assumptions for shadow calculations Maximum distance for influence Calculate only when more than 20 % of sun is covered by the blade Please look in WTG
LisätiedotTM ETRS-TM35FIN-ETRS89 WTG
SHADOW - Main Result Assumptions for shadow calculations Maximum distance for influence Calculate only when more than 20 % of sun is covered by the blade Please look in WTG table WindPRO version 2.8.579
LisätiedotTM ETRS-TM35FIN-ETRS89 WTG
SHADOW - Main Result Assumptions for shadow calculations Maximum distance for influence Calculate only when more than 20 % of sun is covered by the blade Please look in WTG table WindPRO version 2.8.579
LisätiedotTM ETRS-TM35FIN-ETRS89 WTG
SHADOW - Main Result Assumptions for shadow calculations Maximum distance for influence Calculate only when more than 20 % of sun is covered by the blade Please look in WTG table 5.11.2013 16:44 / 1 Minimum
LisätiedotTM ETRS-TM35FIN-ETRS89 WTG
SHADOW - Main Result Assumptions for shadow calculations Maximum distance for influence Calculate only when more than 20 % of sun is covered by the blade Please look in WTG table WindPRO version 2.9.269
LisätiedotTM ETRS-TM35FIN-ETRS89 WTG
SHADOW - Main Result Assumptions for shadow calculations Maximum distance for influence Calculate only when more than 20 % of sun is covered by the blade Please look in WTG table WindPRO version 2.8.579
LisätiedotTM ETRS-TM35FIN-ETRS89 WTG
VE1 SHADOW - Main Result Calculation: 8 x Nordex N131 x HH145m Assumptions for shadow calculations Maximum distance for influence Calculate only when more than 20 % of sun is covered by the blade Please
LisätiedotNetwork to Get Work. Tehtäviä opiskelijoille Assignments for students. www.laurea.fi
Network to Get Work Tehtäviä opiskelijoille Assignments for students www.laurea.fi Ohje henkilöstölle Instructions for Staff Seuraavassa on esitetty joukko tehtäviä, joista voit valita opiskelijaryhmällesi
LisätiedotOn instrument costs in decentralized macroeconomic decision making (Helsingin Kauppakorkeakoulun julkaisuja ; D-31)
On instrument costs in decentralized macroeconomic decision making (Helsingin Kauppakorkeakoulun julkaisuja ; D-31) Juha Kahkonen Click here if your download doesn"t start automatically On instrument costs
LisätiedotTEST REPORT Nro VTT-S Air tightness and strength tests for Furanflex exhaust air ducts
TEST REPORT Nro VTT-S-04515-08 19.5.008 Air tightness and strength tests for Furanflex exhaust air ducts Requested by: Hormex Oy TEST REPORT NRO VTT-S-04515-08 1 () Requested by Order Hormex Oy Linnanherrankuja
LisätiedotEfficiency change over time
Efficiency change over time Heikki Tikanmäki Optimointiopin seminaari 14.11.2007 Contents Introduction (11.1) Window analysis (11.2) Example, application, analysis Malmquist index (11.3) Dealing with panel
LisätiedotRakennukset Varjostus "real case" h/a 0,5 1,5
Tuulivoimala Rakennukset Asuinrakennus Liikerak. tai Julkinen rak. Lomarakennus Teollinen rakennus Kirkollinen rakennus Varjostus "real case" h/a 1 h/a 8 h/a 20 h/a 1 2 3 5 8 4 6 7 9 10 0 0,5 1 1,5 2 km
LisätiedotTM ETRS-TM35FIN-ETRS89 WTG
SHADOW - Main Result Assumptions for shadow calculations Maximum distance for influence Calculate only when more than 20 % of sun is covered by the blade Please look in WTG table WindPRO version 2.8.579
LisätiedotResults on the new polydrug use questions in the Finnish TDI data
Results on the new polydrug use questions in the Finnish TDI data Multi-drug use, polydrug use and problematic polydrug use Martta Forsell, Finnish Focal Point 28/09/2015 Martta Forsell 1 28/09/2015 Esityksen
LisätiedotInformation on preparing Presentation
Information on preparing Presentation Seminar on big data management Lecturer: Spring 2017 20.1.2017 1 Agenda Hints and tips on giving a good presentation Watch two videos and discussion 22.1.2017 2 Goals
LisätiedotTM ETRS-TM35FIN-ETRS89 WTG
SHADOW - Main Result Assumptions for shadow calculations Maximum distance for influence Calculate only when more than 20 % of sun is covered by the blade Please look in WTG table WindPRO version 2.8.579
LisätiedotNational Building Code of Finland, Part D1, Building Water Supply and Sewerage Systems, Regulations and guidelines 2007
National Building Code of Finland, Part D1, Building Water Supply and Sewerage Systems, Regulations and guidelines 2007 Chapter 2.4 Jukka Räisä 1 WATER PIPES PLACEMENT 2.4.1 Regulation Water pipe and its
LisätiedotSatelliittikuvat osana öljypäästövalvontaa
Öljypäästövalvonta Euroopan meriturvallisuusviraston (EMSA) satelliittikuvilta Kati Tahvonen Suomen ympäristökeskus Kaukokartoituspäivät 2007 Helsinki, 8.11.2007 Satelliittikuvat osana öljypäästövalvontaa
Lisätiedot3 9-VUOTIAIDEN LASTEN SUORIUTUMINEN BOSTONIN NIMENTÄTESTISTÄ
Puhe ja kieli, 27:4, 141 147 (2007) 3 9-VUOTIAIDEN LASTEN SUORIUTUMINEN BOSTONIN NIMENTÄTESTISTÄ Soile Loukusa, Oulun yliopisto, suomen kielen, informaatiotutkimuksen ja logopedian laitos & University
Lisätiedot( N117 x HH141 ( Honkajoki N117 x 9 x HH120 tv-alueet ( ( ( ( ( ( ( ( ( ( m. Honkajoki & Kankaanpää tuulivoimahankkeet
Honkajoki & Kankaanpää tuulivoimahankkeet N117 x HH141 Honkajoki N117 x 9 x HH120 tv-alueet Alahonkajoki_kaava_alueen_raja_polyline Asuinrakennus Julkinen tai liiker rak. Lomarakennus Teollinen rak. Allas
Lisätiedot16. Allocation Models
16. Allocation Models Juha Saloheimo 17.1.27 S steemianalsin Optimointiopin seminaari - Sks 27 Content Introduction Overall Efficienc with common prices and costs Cost Efficienc S steemianalsin Revenue
LisätiedotS Sähkön jakelu ja markkinat S Electricity Distribution and Markets
S-18.3153 Sähkön jakelu ja markkinat S-18.3154 Electricity Distribution and Markets Voltage Sag 1) Kolmivaiheinen vastukseton oikosulku tapahtuu 20 kv lähdöllä etäisyydellä 1 km, 3 km, 5 km, 8 km, 10 km
LisätiedotInformation on Finnish Language Courses Spring Semester 2018 Päivi Paukku & Jenni Laine Centre for Language and Communication Studies
Information on Finnish Language Courses Spring Semester 2018 Päivi Paukku & Jenni Laine 4.1.2018 Centre for Language and Communication Studies Puhutko suomea? -Hei! -Hei hei! -Moi! -Moi moi! -Terve! -Terve
LisätiedotExercise 1. (session: )
EEN-E3001, FUNDAMENTALS IN INDUSTRIAL ENERGY ENGINEERING Exercise 1 (session: 24.1.2017) Problem 3 will be graded. The deadline for the return is on 31.1. at 12:00 am (before the exercise session). You
LisätiedotTM ETRS-TM35FIN-ETRS89 WTG
SHADOW - Main Result Assumptions for shadow calculations Maximum distance for influence Calculate only when more than 20 % of sun is covered by the blade Please look in WTG table WindPRO version 2.8.579
LisätiedotTM ETRS-TM35FIN-ETRS89 WTG
SHADOW - Main Result Assumptions for shadow calculations Maximum distance for influence Calculate only when more than 20 % of sun is covered by the blade Please look in WTG table WindPRO version 2.8.579
LisätiedotResearch plan for masters thesis in forest sciences. The PELLETime 2009 Symposium Mervi Juntunen
Modelling tree and stand characteristics and estimating biomass removals and harvesting costs of lodgepole pine (Pinus contorta) plantations in Iceland Research plan for masters thesis in forest sciences
LisätiedotThe CCR Model and Production Correspondence
The CCR Model and Production Correspondence Tim Schöneberg The 19th of September Agenda Introduction Definitions Production Possiblity Set CCR Model and the Dual Problem Input excesses and output shortfalls
LisätiedotGap-filling methods for CH 4 data
Gap-filling methods for CH 4 data Sigrid Dengel University of Helsinki Outline - Ecosystems known for CH 4 emissions; - Why is gap-filling of CH 4 data not as easy and straight forward as CO 2 ; - Gap-filling
LisätiedotI. Principles of Pointer Year Analysis
I. Principles of Pointer Year Analysis Fig 1. Maximum (red) and minimum (blue) pointer years. 1 Fig 2. Principle of pointer year calculation. Fig 3. Skeleton plot graph created by Kinsys/Kigraph programme.
Lisätiedotanna minun kertoa let me tell you
anna minun kertoa let me tell you anna minun kertoa I OSA 1. Anna minun kertoa sinulle mitä oli. Tiedän että osaan. Kykenen siihen. Teen nyt niin. Minulla on oikeus. Sanani voivat olla puutteellisia mutta
LisätiedotLYTH-CONS CONSISTENCY TRANSMITTER
LYTH-CONS CONSISTENCY TRANSMITTER LYTH-INSTRUMENT OY has generate new consistency transmitter with blade-system to meet high technical requirements in Pulp&Paper industries. Insurmountable advantages are
LisätiedotInformation on Finnish Courses Autumn Semester 2017 Jenni Laine & Päivi Paukku Centre for Language and Communication Studies
Information on Finnish Courses Autumn Semester 2017 Jenni Laine & Päivi Paukku 24.8.2017 Centre for Language and Communication Studies Puhutko suomea? -Hei! -Hei hei! -Moi! -Moi moi! -Terve! -Terve terve!
LisätiedotOther approaches to restrict multipliers
Other approaches to restrict multipliers Heikki Tikanmäki Optimointiopin seminaari 10.10.2007 Contents Short revision (6.2) Another Assurance Region Model (6.3) Cone-Ratio Method (6.4) An Application of
LisätiedotInformation on Finnish Language Courses Spring Semester 2017 Jenni Laine
Information on Finnish Language Courses Spring Semester 2017 Jenni Laine 4.1.2017 KIELIKESKUS LANGUAGE CENTRE Puhutko suomea? Do you speak Finnish? -Hei! -Moi! -Mitä kuuluu? -Kiitos, hyvää. -Entä sinulle?
LisätiedotKMTK lentoestetyöpaja - Osa 2
KMTK lentoestetyöpaja - Osa 2 Veijo Pätynen 18.10.2016 Pasila YHTEISTYÖSSÄ: Ilmailun paikkatiedon hallintamalli Ilmailun paikkatiedon hallintamalli (v0.9 4.3.2016) 4.4 Maanmittauslaitoksen rooli ja vastuut...
LisätiedotCapacity Utilization
Capacity Utilization Tim Schöneberg 28th November Agenda Introduction Fixed and variable input ressources Technical capacity utilization Price based capacity utilization measure Long run and short run
LisätiedotAccommodation statistics
Transport and Tourism 2013 Accommodation statistics 2013, February Nights spent by foreign tourists in Finland down by 2.5 per cent in February 2013 The number of recorded nights spent by foreign tourists
Lisätiedotmake and make and make ThinkMath 2017
Adding quantities Lukumäärienup yhdistäminen. Laske yhteensä?. Countkuinka howmonta manypalloja ballson there are altogether. and ja make and make and ja make on and ja make ThinkMath 7 on ja on on Vaihdannaisuus
LisätiedotLUONNOS RT 80260 EN AGREEMENT ON BUILDING WORKS 1 THE PARTIES. May 1998 1 (10)
RT 80260 EN May 1998 1 (10) AGREEMENT ON BUILDING WORKS This agreement template is based on the General Terms and Conditions of Building Contracts YSE 1998 RT 16-10660, LVI 03-10277, Ratu 417-7, KH X4-00241.
LisätiedotCharacterization of clay using x-ray and neutron scattering at the University of Helsinki and ILL
Characterization of clay using x-ray and neutron scattering at the University of Helsinki and ILL Ville Liljeström, Micha Matusewicz, Kari Pirkkalainen, Jussi-Petteri Suuronen and Ritva Serimaa 13.3.2012
LisätiedotSearch for Glacio-Isostatic Faults in the Vicinity of Olkiluoto
Working Report 2007-05 Search for Glacio-Isostatic Faults in the Vicinity of Olkiluoto Antero Lindberg February 2007 POSIVA OY FI-27160 OLKILUOTO, FINLAND Tel +358-2-8372 31 Fax +358-2-8372 3709 Working
LisätiedotData quality points. ICAR, Berlin,
Data quality points an immediate and motivating supervision tool ICAR, Berlin, 22.5.2014 Association of ProAgria Centres Development project of Milk Recording Project manager, Heli Wahlroos heli.wahlroos@proagria.fi
LisätiedotAccommodation statistics
Transport and Tourism 2011 Accommodation statistics 2011, January Nights spent by foreign tourists in Finland increased by per cent in January The number of recorded nights spent by foreign tourists at
LisätiedotKONEISTUSKOKOONPANON TEKEMINEN NX10-YMPÄRISTÖSSÄ
KONEISTUSKOKOONPANON TEKEMINEN NX10-YMPÄRISTÖSSÄ https://community.plm.automation.siemens.com/t5/tech-tips- Knowledge-Base-NX/How-to-simulate-any-G-code-file-in-NX- CAM/ta-p/3340 Koneistusympäristön määrittely
LisätiedotUse of spatial data in the new production environment and in a data warehouse
Use of spatial data in the new production environment and in a data warehouse Nordic Forum for Geostatistics 2007 Session 3, GI infrastructure and use of spatial database Statistics Finland, Population
LisätiedotTIEKE Verkottaja Service Tools for electronic data interchange utilizers. Heikki Laaksamo
TIEKE Verkottaja Service Tools for electronic data interchange utilizers Heikki Laaksamo TIEKE Finnish Information Society Development Centre (TIEKE Tietoyhteiskunnan kehittämiskeskus ry) TIEKE is a neutral,
LisätiedotMUSEOT KULTTUURIPALVELUINA
Elina Arola MUSEOT KULTTUURIPALVELUINA Tutkimuskohteena Mikkelin museot Opinnäytetyö Kulttuuripalvelujen koulutusohjelma Marraskuu 2005 KUVAILULEHTI Opinnäytetyön päivämäärä 25.11.2005 Tekijä(t) Elina
LisätiedotLX 70. Ominaisuuksien mittaustulokset 1-kerroksinen 2-kerroksinen. Fyysiset ominaisuudet, nimellisarvot. Kalvon ominaisuudet
LX 70 % Läpäisy 36 32 % Absorptio 30 40 % Heijastus 34 28 % Läpäisy 72 65 % Heijastus ulkopuoli 9 16 % Heijastus sisäpuoli 9 13 Emissiivisyys.77.77 Auringonsuojakerroin.54.58 Auringonsäteilyn lämmönsiirtokerroin.47.50
LisätiedotPAINEILMALETKUKELA-AUTOMAATTI AUTOMATIC AIR HOSE REEL
MAV4 MAV5 MAV6 PAINEILMALETKUKELA-AUTOMAATTI AUTOMATIC AIR HOSE REEL Käyttöohje Instruction manual HUOMIO! Lue käyttöohjeet huolellisesti ennen laitteen käyttöä ja noudata kaikkia annettuja ohjeita. Säilytä
LisätiedotJulkaisun laji Opinnäytetyö. Sivumäärä 43
OPINNÄYTETYÖN KUVAILULEHTI Tekijä(t) SUKUNIMI, Etunimi ISOVIITA, Ilari LEHTONEN, Joni PELTOKANGAS, Johanna Työn nimi Julkaisun laji Opinnäytetyö Sivumäärä 43 Luottamuksellisuus ( ) saakka Päivämäärä 12.08.2010
LisätiedotDIGITAL MARKETING LANDSCAPE. Maatalous-metsätieteellinen tiedekunta
DIGITAL MARKETING LANDSCAPE Mobile marketing, services and games MOBILE TECHNOLOGIES Handset technologies Network technologies Application technologies INTRODUCTION TO MOBILE TECHNOLOGIES COMPANY PERSPECTIVE
LisätiedotJOKIJÄÄN JA JÄÄPATOJEN VAIKUTUS VEDENKORKEUKSIIN JA UOMAN KULUTUSVOIMIIN
JOKIJÄÄN JA JÄÄPATOJEN VAIKUTUS VEDENKORKEUKSIIN JA UOMAN KULUTUSVOIMIIN Maria Kämäri 1,2 Eliisa Lotsari 2, Petteri Alho 3, Juha Aaltonen 1, Mikko Huokuna 1 1 Suomen ympäristökeskus SYKE 2 Itä-Suomen yliopisto,
LisätiedotKysymys 5 Compared to the workload, the number of credits awarded was (1 credits equals 27 working hours): (4)
Tilasto T1106120-s2012palaute Kyselyn T1106120+T1106120-s2012palaute yhteenveto: vastauksia (4) Kysymys 1 Degree programme: (4) TIK: TIK 1 25% ************** INF: INF 0 0% EST: EST 0 0% TLT: TLT 0 0% BIO:
LisätiedotReturns to Scale II. S ysteemianalyysin. Laboratorio. Esitelmä 8 Timo Salminen. Teknillinen korkeakoulu
Returns to Scale II Contents Most Productive Scale Size Further Considerations Relaxation of the Convexity Condition Useful Reminder Theorem 5.5 A DMU found to be efficient with a CCR model will also be
LisätiedotAccommodation statistics
Transport and Tourism 201 Accommodation statistics 201, May Nights spent by foreign tourists in Finland up by 11 per cent in May 201 Overnight stays by foreign tourists continued increasing at Finnish
LisätiedotTree map system in harvester
Tree map system in harvester Fibic seminar 12.6.2013 Lahti Timo Melkas, Metsäteho Oy Mikko Miettinen, Argone Oy Kalle Einola, Ponsse Oyj Project goals EffFibre project 2011-2013 (WP3) To evaluate the accuracy
LisätiedotMONITORING OF GROUNDWATER GEOCHEMISTRY IN THE RIUTTA AREA.
Geological Survey of Finland REPORT Eastern Finland Unit Dnro K555/52/2006 & K129/53/2004 Kuopio 24.10.2008 Markku Tenhola Public 1.1.2013 139/2013 AREVA Resources Finland Oy Tapani Hyysalo Aleksanterinkatu
LisätiedotELEMET- MOCASTRO. Effect of grain size on A 3 temperatures in C-Mn and low alloyed steels - Gleeble tests and predictions. Period
1 ELEMET- MOCASTRO Effect of grain size on A 3 temperatures in C-Mn and low alloyed steels - Gleeble tests and predictions Period 20.02-25.05.2012 Diaarinumero Rahoituspäätöksen numero 1114/31/2010 502/10
LisätiedotMEETING PEOPLE COMMUNICATIVE QUESTIONS
Tiistilän koulu English Grades 7-9 Heikki Raevaara MEETING PEOPLE COMMUNICATIVE QUESTIONS Meeting People Hello! Hi! Good morning! Good afternoon! How do you do? Nice to meet you. / Pleased to meet you.
LisätiedotDigital Admap Native. Campaign: Kesko supermarket
Digital Admap Native Campaign: Kesko supermarket Digital Admap Native Campaign: Kesko Supermarket Mainosmuoto: Natiivi Media: IS.fi Campaign period: 25 September Date of measurement: 26 September Unique:
LisätiedotRANTALA SARI: Sairaanhoitajan eettisten ohjeiden tunnettavuus ja niiden käyttö hoitotyön tukena sisätautien vuodeosastolla
TURUN YLIOPISTO Hoitotieteen laitos RANTALA SARI: Sairaanhoitajan eettisten ohjeiden tunnettavuus ja niiden käyttö hoitotyön tukena sisätautien vuodeosastolla Pro gradu -tutkielma, 34 sivua, 10 liitesivua
LisätiedotAccommodation statistics
Transport and Tourism 2013 Accommodation statistics 2012, December Nights spent by foreign tourists in Finland up by 45 per cent in December 2012 The number of recorded nights spent by foreign tourists
LisätiedotRotarypiiri 1420 Piiriapurahoista myönnettävät stipendit
Rotarypiiri 1420 Piiriapurahoista myönnettävät stipendit Ø Rotarypiiri myöntää stipendejä sille osoitettujen hakemusten perusteella ensisijaisesti rotaryaatteen mukaisiin tarkoituksiin. Ø Stipendejä myönnetään
LisätiedotEija Lahtinen Uudet kelikamerat Kaakkois-Suomen tiepiiri
Eija Lahtinen Uudet kelikamerat Kaakkois-Suomen tiepiiri VIKING Eija Lahtinen Uudet kelikamerat Kaakkois-Suomen tiepiiri Tiehallinto Kaakkois-Suomen tiepiiri Liikenteen palvelut Kouvola 2001 Raportin
LisätiedotOn instrument costs in decentralized macroeconomic decision making (Helsingin Kauppakorkeakoulun julkaisuja ; D-31)
On instrument costs in decentralized macroeconomic decision making (Helsingin Kauppakorkeakoulun julkaisuja ; D-31) Juha Kahkonen Click here if your download doesn"t start automatically On instrument costs
LisätiedotVoice Over LTE (VoLTE) By Miikka Poikselkä;Harri Holma;Jukka Hongisto
Voice Over LTE (VoLTE) By Miikka Poikselkä;Harri Holma;Jukka Hongisto If you are searched for a book by Miikka Poikselkä;Harri Holma;Jukka Hongisto Voice over LTE (VoLTE) in pdf form, then you have come
LisätiedotKuvailulehti. Korkotuki, kannattavuus. Päivämäärä 03.08.2015. Tekijä(t) Rautiainen, Joonas. Julkaisun laji Opinnäytetyö. Julkaisun kieli Suomi
Kuvailulehti Tekijä(t) Rautiainen, Joonas Työn nimi Korkotuetun vuokratalon kannattavuus Ammattilaisten mietteitä Julkaisun laji Opinnäytetyö Sivumäärä 52 Päivämäärä 03.08.2015 Julkaisun kieli Suomi Verkkojulkaisulupa
LisätiedotBasic Flute Technique
Herbert Lindholm Basic Flute Technique Peruskuviot huilulle op. 26 Helin & Sons, Helsinki Basic Flute Technique Foreword This book has the same goal as a teacher should have; to make himself unnecessary.
LisätiedotPyhäjärven suojeluohjelma Ajankohtaista 01/2018
Pyhäjärven suojeluohjelma Ajankohtaista 01/2018 Pyhäjärvi-instituutti, Sepäntie 7, 27500 Kauttua 0440 344 054, www.pyhajarvi-instituutti.fi, @PJinstituutti Kuva: Leena Kirsti Juusela, FB Käynnissä
LisätiedotOn instrument costs in decentralized macroeconomic decision making (Helsingin Kauppakorkeakoulun julkaisuja ; D-31)
On instrument costs in decentralized macroeconomic decision making (Helsingin Kauppakorkeakoulun julkaisuja ; D-31) Juha Kahkonen Click here if your download doesn"t start automatically On instrument costs
LisätiedotSalasanan vaihto uuteen / How to change password
Salasanan vaihto uuteen / How to change password Sisällys Salasanakäytäntö / Password policy... 2 Salasanan vaihto verkkosivulla / Change password on website... 3 Salasanan vaihto matkapuhelimella / Change
LisätiedotSupporting Information for
Supporting Information for Analysis of Sogatella furcifera proteome that interact with P10 protein of Southern rice black-streaked dwarf virus Win Than*, Faliang Qin*, Wenwen Liu, Xifeng Wang ** State
LisätiedotAccommodation statistics
Transport and Tourism 2014 Accommodation statistics 2013, December Nights spent by foreign tourists in Finland up by 5.5 per cent in December 2013 The number of recorded nights spent by foreign tourists
LisätiedotPaikkatiedon semanttinen mallinnus, integrointi ja julkaiseminen Case Suomalainen ajallinen paikkaontologia SAPO
Paikkatiedon semanttinen mallinnus, integrointi ja julkaiseminen Case Suomalainen ajallinen paikkaontologia SAPO Tomi Kauppinen, Eero Hyvönen, Jari Väätäinen Semantic Computing Research Group (SeCo) http://www.seco.tkk.fi/
Lisätiedot4x4cup Rastikuvien tulkinta
4x4cup Rastikuvien tulkinta 4x4cup Control point picture guidelines Päivitetty kauden 2010 sääntöihin Updated for 2010 rules Säännöt rastikuvista Kilpailijoiden tulee kiinnittää erityistä huomiota siihen,
LisätiedotJaska-hanke. Oil contaminated properties: Gas stations, village shops, oil spills, garages
JASKA-hanke 1 The Oil Pollution Compensation Fund finances the investigations and remediations of oil contaminated properties Oil Industry Service Centre and Pöyry Finland Oy provides the project management
LisätiedotFinFamily PostgreSQL installation ( ) FinFamily PostgreSQL
FinFamily PostgreSQL 1 Sisällys / Contents FinFamily PostgreSQL... 1 1. Asenna PostgreSQL tietokanta / Install PostgreSQL database... 3 1.1. PostgreSQL tietokannasta / About the PostgreSQL database...
LisätiedotAlternative DEA Models
Mat-2.4142 Alternative DEA Models 19.9.2007 Table of Contents Banker-Charnes-Cooper Model Additive Model Example Data Home assignment BCC Model (Banker-Charnes-Cooper) production frontiers spanned by convex
LisätiedotPelletizing trials Autum 2008
Pelletizing trials Autum 2008 Simo Paukkunen NKUAS simo.paukkunen@pkamk.fi Raw material Basic information Logging residues from spruce (Picea abies [L.] Karst.) dominant final cuttings, harvested in spring
LisätiedotTIKIT a) Suorassa tikissä ristiommel jää nahan alle piiloon. b) Ristitikissä ommel jää näkyviin.
CML WHEEL COVER -RUORINAHKAN OMPELUOHJE Liota nahkoja lämpimässä vedessä n. 15 minuuttia ennen ompelua. Pidä nahka kosteana koko ompelun ajan esim. sumutepullolla. Pidä ommellessa kevyt kireys nahkaan,
LisätiedotMethods S1. Sequences relevant to the constructed strains, Related to Figures 1-6.
Methods S1. Sequences relevant to the constructed strains, Related to Figures 1-6. A. Promoter Sequences Gal4 binding sites are highlighted in the color referenced in Figure 1A when possible. Site 1: red,
LisätiedotCapacity utilization
Mat-2.4142 Seminar on optimization Capacity utilization 12.12.2007 Contents Summary of chapter 14 Related DEA-solver models Illustrative examples Measure of technical capacity utilization Price-based measure
LisätiedotChoose Finland-Helsinki Valitse Finland-Helsinki
Write down the Temporary Application ID. If you do not manage to complete the form you can continue where you stopped with this ID no. Muista Temporary Application ID. Jos et onnistu täyttää lomake loppuun
LisätiedotCurriculum. Gym card
A new school year Curriculum Fast Track Final Grading Gym card TET A new school year Work Ethic Detention Own work Organisation and independence Wilma TMU Support Services Well-Being CURRICULUM FAST TRACK
LisätiedotKalliopinnan varmistukset seismisillä linjoilla ja suunnitellun kuilun alueella syksyllä 2002
Työraportti 2002-51 Kalliopinnan varmistukset seismisillä linjoilla ja suunnitellun kuilun alueella syksyllä 2002 Mari Lahti Lokakuu 2002 POSIVA OY FIN-27160 OLKILUOTO, FINLAND Tel. +358-2-8372 31 Fax
Lisätiedot7.4 Variability management
7.4 Variability management time... space software product-line should support variability in space (different products) support variability in time (maintenance, evolution) 1 Product variation Product
LisätiedotKAAPELIN SUOJAAMINEN SUOJAMATOLLA
KAAPELIN SUOJAAMINEN SUOJAMATOLLA Laitteisto koostuu: Kaapelin suojamatosta DAFIGAINE Maton asennuslaitteesta SPIRALERDALEN Motorisoidusta kaapelikelatrailerista DAFISTOCKER. Kaapelikelatraileri mahdollistaa
LisätiedotOP1. PreDP StudyPlan
OP1 PreDP StudyPlan PreDP The preparatory year classes are in accordance with the Finnish national curriculum, with the distinction that most of the compulsory courses are taught in English to familiarize
Lisätiedot